FOB Price
Obtener el precio más reciente( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
Wooden case
Delivery Time:
20 days
Supplying Ability:
100 Set per Month
Payment Type:
T/T
Persona de contacto Mandy
South of Sanhongqi Bridge,Guangzhu Highway,Lunjiao Town,Shunde, Foshan, Guangdong
Max. drilling diameter | D=Ø*0mm | Drill chuck aperture | Ø*0mm and Ø*2.7mm |
Motor power | P=1.5kwx2=3.0kw | Working pressure | P=0.6~0.8Mpa |
Cylinder trip | S=*0mm | Exterior of machine | ***0x***0x**0mm |
Drilled hinge specifications | *8x6 | Weight of Machine | G=**0 kgs |