FOB Price
Obtener el precio más reciente|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
pvc films
Delivery Time:
30 days
Supplying Ability:
-
Payment Type:
T/T, L/C
Persona de contacto Ms. Lanfang
Nanxin Road, Nantong, Jiangsu
The steel formwork can form any shape to meet the need of an urgent capping. Working can be quickly recovered, so there is no need to remove the formwork. This steel plate doesn't require any scabbing and can be installed directly. This machine can be set before or after installation rebars. It can be inspected during pouring process and reduces the risk of holes and honeycomb structures. If there is something wrong during the pouring process, the high ribbed formwork will be an idling device. Made in steel protection, this high ribbed formwork is a fast solution to offer proper protection.