FOB Price
Obtener el precio más reciente208 / Piece
|Minimum Order
Place of Origin:
china
Price for Minimum Order:
Minimum Order Quantity:
200 Piece
Packaging Detail:
internation standard packing/no packing
Delivery Time:
within 16 day after receiving advance payment
Supplying Ability:
2000 Piece per Day
Payment Type:
T/T, L/C
Persona de contacto Ms. Alice
Fuzhou Road , Qingdao, Shandong
Here is the size we can supply
**5/*5R*4.***6 | 7.*0R****4 |
**5/*5R*2.***6 | 8.*5R****6 |
**5/*0R*2.***8 | 8.*5R****6 |
**5/*0R*2.***0 | 9.*0R****6 |
**5/*5R*2.***0 | *0.*0R****8 |
*1R*2.***6 | *1.*0R****8 |
*1R*4.***6 | *2.*0R****8 |
*2R*2.***0 | ***0R****0 |
*3R*2.***8 | and etc. |
Low heat generation, wearability for long tyre life and low fuel consumption per kilometre.
High speed and durability performances.
Resist stone retention and drilling.
Water draining wet skid resistance and soft soil mobility