FOB Price
Obtener el precio más reciente|
Minimum Order
Place of Origin:
xinxiang city,henan province
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
container
Delivery Time:
10 days after getting deposit
Supplying Ability:
20 Set per Month
Payment Type:
T/T
Persona de contacto michael
Pingdingshan, Henan
3.Main features :
Safety:
1. With an auto welding machine for the reactor, it can not only greatly improve working efficiency but also guarantee the quality of welding seam, thus avoid explosion caused by gas leak.
2. Vacuum system will prevent oil gas from going back to reactor and causing accident.
3. Professional thermometer, pressure gauge and safety valve.
4.It is dangerous to burn exhaust gas(C1 to C4) without any safety measures. In our process, it is transferred first through the safety device and a safety burning air muzzle. Before burning, we should ensure the safety of production.
Environment friendly:
1.Well water dedusting system can avoid black smoke.
2.The exhaust gas will be recycled for heating reactor, no gas pollution
3.Every junction of the reactor is in good sealing situation with professional sealing material.
Long service life:
1.Material: Q**5R special steel plate ,thickness *4mm.
2. Welding: Automatic welding machine with heating treatment
3. The service life of the reactor will be 8 **0 years
Energy saving:
1. Well sealing for heating system , no gas leak and saving fuel.
2. The exhaust gas will be recycled for reactor heating.
Items |
Contents |
||
Raw material |
Waste tires, scrap plastic, waste rubber |
||
Structure form |
Horizontal |
||
Model |
DT*6T |
DT*8T |
DT**0T |
Size of reactor |
D***0mm*L***0mm |
D***0mm*L***0mm |