FOB Price
Obtener el precio más reciente|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
25 Piece
Packaging Detail:
25pcs per carton
Delivery Time:
7-15 working days
Supplying Ability:
30000 Piece per Month
Payment Type:
PayPal, Western Union, T/T
Persona de contacto Ms. Helen
3rd Floor, D# Building, ShangPai Industrial Park,BeiHuan Road, ShiYan Town, Shenzhen, Guangdong
1. Dimension:Â Â Â Â Â Â Â Â Â ***8mm(L) / *6mm (Dia.)
2. Input Voltage:Â Â Â Â Â Â Â AC:*****5V,AC:******0V,AC:******0V,****0HZ,optional
3. PF(power factor):Â Â Â Â > 0.*2
4. Power efficiency:Â Â Â Â > *5%
5. Light efficiency:Â Â Â Â Â ****0LM/W
6. Case Material:Â Â Â Â Â Â Aluminum base +PC cover
7. PC cover:Â Â Â Â Â Â Â Â Â Â Clarity PC, Forsted PC, Thin stripe PC, optional
8. CRI:Â Â Â Â Â >*0
   9. CCT:    Warm
white (WW): ********0k, Nature White(NW):
********0k,
             Pure
White(PW): ********0k, Cold
White(CW): ***0k+.
*0. Working Temperature: Â Â **0~*0 degrees
*1. Long lifespan:Â Â Â Â Â Â Â Â Â Â >*0,**0 hours
*2. Warranty Period:Â Â Â Â Â Â Â Â 3 years
*3. Certification:Â Â Â Â Â Â Â Â Â Â Â CE&
ROHS
Â
Features:
- Direct replacement for traditional tubes
- Long lifespan up to ****0hrs
- Work without ballast and less energy consumed
- Slow failure, minimum maintenance cost, the economic choice
- Low operating temperature, produce little heat, recyle without hazardous gasse and materials, green choice. .
- Immediate start, no noise output, no humming and flickering,healthy and safe choice.
- Shock Resistant, much more durable than traditional light sources
- Rated to operate from **0°C to *0°C, perfect for environments with extreme climates
Â
Usage Instruction:
A. When installing LED tube to the hanger with Inductive ballast:
1. Take out the starter from the hanger.
2. Take out the inductive ballast and connect the wire (Refer to the following drawing).
(The tube can work normally without this step. But it is strongly suggested for energy saving since the ballast may consume much power)
3. Install the LED tube into the hanger directly.
B. Installing LED tube to the hanger with Electronic ballast :
1. Take down the electronic ballast from the lamp hanger.
2. Connect the wire. (Refer to the following drawing)
3. Install the LED tube into the hanger directly.