FOB Price
Obtener el precio más reciente829 / Piece
|Minimum Order
Place of Origin:
zhejiang
Price for Minimum Order:
Minimum Order Quantity:
1 Piece
Packaging Detail:
EXPORT CARTON
Delivery Time:
7days
Supplying Ability:
800 Set per Week
Payment Type:
T/T, L/C
Persona de contacto Ms. Antonia
No.16yuanhua indstry partHaining city, Jiaxing
2. Features:
1. Split solar water heater Collector separates with storage
tank. The tank can be put in any place of house. The collector can
be put on the inclined roof or flat place.
2. Module design, arbitrary combination, harmony with the building
perfectly.
3. Anti-freeze: No water inside the tubes when it works, superior
anti-freezing function.
4. Intelligent control and automatic operation, work at anytime and
enjoyable.
3. Technical and Material Details Description:
Storage tank: 1. Tank capacity (L): **0,**0,**0,**0,**0,**0,**0. 2. Inner tank material: SUS****2B, thickness: 1.0mm,1.5mm,2.0mm(optional).Water purity for drinking. 3. Outer tank material: Color steel. 4. Insulation layer: Polyurethane foam,thickness:*0mm,*5mm. (optional). 5. Working pressure: 0.6Mpa*0.8Mpa 6. Electrical heater: ***0W, ***0W, ***0W(optional). 7. Preservation hours: *2 hours |
Solar collector: 1. Tube size: *8****0mm. 2. Type: Heat pipe. 3. Tube quantity: *0/*5/*0/*5/*0/*0/*0 tubes. 4. Manifold Casing material: 1.6 mm thickness /Aluminum. 5. Bracket material: 1.5mm thickness /galvanized or Aluminum. Optimal installation angel: vertical ****0 degree, horizontal 0 degree. 6. Header Pipe material: 1.2mm thickness /copper. 7. Insulation layer: Polyurethane /Rockwool. 8. Rubber seals and rings: UV stabilized high temperature silicone rubber. 9. Operating pressure: 6 bar **2bar. *0. Low temperature resist:**0°C *1. Hail resistance: *5mm |
Workingstation: It contains an expansion tank, a circulation pump, a controller, a balancing valve, a pressure gauge, a safety valve etc. 1. German import WILO water pump. 2. Italy import expansion tank. 3. Intelligent controller(include function). a. Water level and water temperature display. b. Water scarcity prompting and water supply timing. c. Heating timing. d. Pipeline thermal retardation. e. Automatic booster pump. f. Regulate sensor sensitivity. |