¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell Workover Rig

Sell Workover Rig

|

Minimum Order

Place of Origin:

China

Price for Minimum Order:

-

Minimum Order Quantity:

1 Set

Packaging Detail:

inland packing&sea transportation packing

Delivery Time:

-

Supplying Ability:

-

Payment Type:

T/T, L/C

Contactar ahora
Miembro Básico

Persona de contacto Mr. Steven

No.320, Puhe Road, East Section of Xindu Industrial Zone, Chengdu, Sichuan

Contactar ahora

Description

Features:
1.  This kind of workover rigs are designed and manufactured in accordance with API Spec Q1,4F,7k,8C and technical standards of RP**0,GB***6.1,GB***6.2,GB***8,SY***2 as well as“3C”compulsary standard.

2.  The whole rig structure is compact, highly integrated, and requires a small space for installation.

3.  The heavy-duty chassis are 8×6,*0×8,*2×8,*4×8 constant-drive and self-propelled, equipped with hydraulic steering system and have a good capability of passage and crossing country.

4.  A good and reasonable assembly of CATERPILLAR engine and ALLISON transmission box can supply a high driving efficiency and increase safe performance.

5.  Band brake or disc brake is applied for the main brake and the air disc brake/water brake or FDWS is used for auxiliary brake.

6.  The compound box for rotary table has a function of forward-reverse speed shift gears, which can be suitable for DP’s rotary operations. The anti-torque releasing device can be used to release the deformation energy of the DP safely.

7.  The mast is front-open type, with double- section structure, which can be telescoped, raised and extended hydraulically.

8.  The drill floor is twin-body telescopic type or with parallelogram structure, which is convenient for installation and transportation. The dimension and height of the drill floor can be designed according to the user’s requirements.

9.  Safety and inspection measures are strengthened under the guidance of the design concept of “Humanism Above All” to meet the requirements of HSE.

Send a direct inquiry to this supplier

A:

Mr. Steven < Sichuan LiDa Petroleum Machinery Engineering Co., Ltd. >

quiero saber: