¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell WPC Construction Formwork

Sell WPC Construction Formwork

|

Minimum Order

Place of Origin:

Foshan,China

Price for Minimum Order:

-

Minimum Order Quantity:

1000 Square Meter

Packaging Detail:

standard packing

Delivery Time:

20 to 30 days

Supplying Ability:

100000 Square Meter per Month

Payment Type:

L/C, T/T

Contactar ahora
Miembro Básico

Persona de contacto Ms. Chan

27th Baota Road Shiwan Town,Chancheng District, Foshan, Guangdong

Contactar ahora

Description

Usage and advantage of construction formwork:
can formal the new pouring concrete and conserve it. So as the temporary structure has to reach strength to withstand itself, and to remove the model formwork. The main advantage is making and assembling freely, especially fit for the complicated outer shape, small quantity concrete structure or construction work.  
Reference:
1. Hardness≧*6.4HRR.   
2. Expand water absorb thickness
≦0.4%.
3. MOR≧*1.9Mpa.      
4. MOE
≧3.*5×*0^3 Mpa
5. Screw Holding Capability≧***0N  
●Specification of wood-plastic composite formwork  
Normal size: ***0****0**2mm(*4kg), ***0****0*9mm(*3kg), can produce thickness 9、*2mm and etc.  
●maintenance of wood-plastic composite formwork 
1.MAINTENANCE
A. No scrape or beat it by hard when using. Clean up The surface in time.
B. Empty space should stuff with similar materials after use or transfer.
C. Be careful of load and unload formwork and small components. No throw, toss, or pitch and take measures to protect form crash. D. Small components should clean up and keep tidy.  
2.STORAGE.
A. According the formwork size to pile up on the cleared ground between the small pieces of wood prevent from damage. Suitable spaces of mall pieces of wood can avoid formwork form deformation and crash.
B. Formwork should keep well ventilated and prevent form the sun and erosion medium when long-term store.

Send a direct inquiry to this supplier

A:

Ms. Chan < Foshan Nanhai Hengxing Plastic Building Material Co., Ltd >

quiero saber: