FOB Price
Obtener el precio más reciente20000 / Set
|Minimum Order
Place of Origin:
Henan, China (Mainland)
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Export standard container 20GP OR 40GP, 40HQ, FR container, In bulk, the spare parts in wooden case.
Delivery Time:
45days after order confirmation
Supplying Ability:
50 Set per Year
Payment Type:
T/T, Western Union
Persona de contacto Amy
Zhengshang, Zhengzhou, Henan
We are most professional manufacturer of autoclaved aerated concrete (AAC) plants for more than *2 years, and we can supply complete set of autoclaved aerated concrete plant with *0 **0m3, **0 **0m3, **0 **0m3, **0 **0m3, **0 **0m3, **0 **0m3 capacity annually, including plant design, equipments installation, technical instruction, personal training, etc, and also can design and manufacture as per clients' requirement.
Raw materials of aac line:cement, lime, sand, flyash, gypsum, aluminium powder, water
Equipment list of aac
line:
The
equipment will be divided into two parts: specialized equipment and
universal equipment.
Specialized aac line equipment
includes:
1.
Cutting equipment: tilting crane, cutter.
2. Proportioning equipment: elecronic measuring scle, slurry
beating machine, slurry storage tank, slurry mixer.
3. Pouring and autoclave equipments: aluminum powder mixer, pouring
mixer, mould, side plate, autoclave truck, carrier car.
4. Enviornment protect equipments: dust remover.
Other relative equipments as
follows:
1.
Cutting machine.
2. Tilting hanger, mould, side plate, hardening cart, mould frame,
mould bottom, casting machine, hoist
3. autoclave, horizontal installation steam
boiler.
AAC
production
procession:
The
aerocrete produces the technological process:
1. The raw materials store in the material storehouse (or stores
the pot) after dealing with reserve such as lime, cement, gypsum,
sand (or fly ash)
2. Aluminium powder or aluminium lotion is through dealing with the
reseve material for use
3. Raw materials measure according to certain matching by electron
balance measure, aluminum powder, water put into aluminum mixer. it
is suspends the liquid to make the mixture after measuring.
4. The batching water (cold water or hot water pitcher hot water)
is measured by the electronic water balance.
5. Put into and pour among the mixers in certain order after, raw
materails, aluminum powder suspend the liquid is measured, pour and
enter the mould after mixing evenly (panel should be put network
slice of reinforcing bar in advance in the mould)
6. Quiet to is it raise in advance to park through certain
temperature and time, is it transport to the cutting machine to
hang from upset hoist upset *0 degree after the base body reaches
certain intensity, the drawing of patterns is cut
a. The base body carries on the side and cuts and mills through
vertically at first
b. Then carry on the vertical level to cut
c. Cut horizontally finally
d. Cut good base body raises to cauldron car go on one yard of
shelves organize into groups to steam to transport to hang to drive
a vehicle to load.
7. Raise products well, produce
after the cauldron breaking the board off the fingers and thumb by
the board breaking off the fingers and thumb machine to steam
8. Pile from finished product hoist or forklift to finished product
field pile the buttess according to specification to carry
9. Steaming and raising the car and side board and entering the
next board of circulation and returning after, the finished product
is unloaded, with upset hoist mould frame association the drawing
of patterns get off, restore *0 degrees return to pour mixer pour
again after clearing up.