FOB Price
Obtener el precio más reciente|
Minimum Order
Place of Origin:
Xinxiang Henan Province in China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Acre
Packaging Detail:
according to the clients' demands.
Delivery Time:
60 days
Supplying Ability:
100 Set per Month
Payment Type:
T/T, L/C
Persona de contacto Ms. Jie
Yanjin, Xinxiang, Henan
At present, the steel structure of motorized transfer
trolley has been widely applied in the plant building.
And the primary member of steel structural plants is
welding Htype steel stem, girder and support.
There exists a problem of welding deformation during
the manufacturing operation of these members. If the
welding deformation doesn't correct, it doesn't only
have an effect on the integral installation but also
reduce the safety reliability of this installation.
If the deformation in the process of welding
steel structure about motorized transfer cart is
between the permitted deformation range, we should
try to correct them to make these according with
the quality requirement of products. It has been
found that most distorted members can be corrected.
To make a new deformation achieves the goal of can
celling the previous deformation, which is the
so-called antidote.
The category of welding deformation about steel
structure and flame correction:
The primary member of steel structure is welding H-type steel steam, girder and support. Welding
deformation usually applies the following three
flame corrections: (1) Line Heating; (2) Pointlike
Heating; (3) Triangle Heating.