¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
PUXIN family size biogas digester

PUXIN family size biogas digester

|

Minimum Order

Place of Origin:

China

Price for Minimum Order:

-

Minimum Order Quantity:

1

Packaging Detail:

-

Delivery Time:

wthin two weeks

Supplying Ability:

1000

Payment Type:

-

Contactar ahora

Persona de contacto Mr. Vane

1-2nd floor, Bldg 4, Masha Xuda High-tech. Industry Park, 49 Jiaoyu North Dd, Gaoqiao, Pingdi , Long, Shenzhen, Guangdong

Contactar ahora

Description

1. Introduction PUXIN Household Household biogas digester system for waste treatmentis composed of a 6 or *0 m3 PUXIN biogas plant, pipe routes, gas purify devices and gas appliances or small power biogas generator. PUXIN Household biogas digester system for waste treatmentismainly applied to farmhouse or domestic house to treat livestock waste, straw, human sewage and food waste. 2. Contrast between fixed dome and Puxin biogas plant Contrast of the technical requirements for the builders Items The traditional fixed dome hydraulic biogas plant The Puxin Biogas plant Airtight craft Highly required Not required Ability to understand blueprint Highly required Not required Ability to build the arch Highly required (build by hand) Not required (cast by mould) To judge and deal with gas leaking Highly required Required To judge and deal with water leaking Highly required Required Training period About 3 month About one week Period to become a proficient builder **2 years About one month Requirement of the people to be trained Medium educated, strong ability to master skills Not Educated, medium ability to master skills Success rate Not **0% guaranteed **0% guaranteed Contrast of the maintenance Items The traditional fixed dome hydraulic biogas plant The Puxin Biogas plant To mend the gas leak of gas-holder Dangerous and difficult The job is done inside the biogas digester, there is a possibility of poisoning. The leak can not be found. Safe and easy The job is done on ground, there is no possibility of poisoning. The leak can be seen, and can be mended directly. To mend the water leak of the digester Dangerous The digester’ outlet is too small that the air circulation in the digester is bad. So, there is a possibility of poisoning. Safe The digester’s outlet is large enough that the air circulation in the digester is good. So, there is no possibility of poisoning. 3. Construction process 4. Cost breakdown of *0 m3 Material (manpower) quantity Glass fibre reinforced plastic Gasholder 1 Smashed stone 4m3 Sand 3.5m3 cement ***0kg Brick(*0×**0×**0mm) **0 Plastic pipe (Φ**0×***0mm) 2 concrete bar (Φ6) 8kg manpower 6 man×1 day (digging a hole)+ 6 man×1 day (casting concrete)+ 2 man×1 day (to build inlet, outlet and install pipe systems) Earth work *0 m3 (steel mould with outer) PUXIN family size biogas digester

Send a direct inquiry to this supplier

A:

Mr. Vane < SHENZHEN PUXIN TECHNOLOGY CO. LTD >

quiero saber: