FOB Price
Obtener el precio más reciente1463438 / Set
|Minimum Order
Place of Origin:
shanghai,china
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
-
Delivery Time:
50 days
Supplying Ability:
1 Set per Month
Payment Type:
T/T, L/C, D/A, Western Union
NO. | Equipment | Specification | Power | Unit price | Quantity | Sub-account |
I. Raw materials storage and mixing section | ||||||
1.1 | Belt conveyor | B**0X*8m | 5.5kw | $3,**5.*0 | 1set | $3,**5.*0 |
1.2 | Bucket elevator | NE**0x*5m | *5kw | $*8,**1.*0 | 1set | $*8,**1.*0 |
1.3 | Screw valve | **0x**0 | $**5.*0 | 6pcs | $3,**0.*0 | |
1.4 | Belt weigher | SBD**0 | 1.5kw x4=6kw | $*0,**6.*0 | 4pcs | $*0,**4.*0 |
1.5 | Screw weigher | DGFL**0 | 2.2kwx2=4.4kw | $5,**8.*0 | 2pcc | $*1,**6.*0 |
1.6 | Dust collector | PPC***6 | *2kwx2=*4kw | $*8,**0.*0 | 2pcs | $*7,**0.*0 |
1.7 | Vane feeder | Φ**0X**0 | 2.2kwX2 | $1,**5.*0 | 4pcs | $7,**0.*0 |
1.8 | Belt conveyor | B**0×*5m | 7.5kw | $6,**0.*0 | 1set | $6,**0.*0 |