¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Seamless High Pressure Boiler Steel Tubes For Power Plant

Seamless High Pressure Boiler Steel Tubes For Power Plant

1 /

|

Minimum Order

Place of Origin:

china

Price for Minimum Order:

Minimum Order Quantity:

25T

Packaging Detail:

-

Delivery Time:

5DAY

Supplying Ability:

-

Payment Type:

-

Contactar ahora
Miembro Básico

Persona de contacto Mr. green

guobin road yangpu district, shanghai, shanghai

Contactar ahora

Description

Steel Tube For Boiler And heat exchanger, Condenser application Specification: A)The products are suitable for making super-heaters, re-heaters, water all, economizer in large-scale power plant. B)Product Standard: The products shall be supplied accoring to GB***0 standard, or ASME SA**9M, ASME SA**0M, ASME SA**3M, EN******2, DIN****5, JIS G***1, JIS G***2 etc. C)Product Steel Grade GB***0: *0G, *5CrMoG(T*2), *2Cr1MoVG(T*1), R**2 etc. ASME SA**9M: SA**9 T1, SA**9T1b etc. ASME SA**0M: SA**0A1, SA**0C etc. ASME SA**3M: SA**3 T2, T5(Cr5Mo, *2CrMo**5), T*1, T*2, T*2(Cr2Mo), T*3, T*1, T*2 etc. EN******2: P**5GH, P**5GH, P**5GH, *6Mo3, *0CrMo**5, *3CrMo**5, *0CrMo***0(T*2), X*0CrMoVNb**1 etc. DIN****5: St*5.8/III, St*5.8/III, *5Mo3, *0CrMo**0 etc. JIS G ***1: STB**0, STB**0 etc. JIS G ***2: STBA*2, STBA*2, STBA*4 etc. Mobile: **6 **********9 ->evergreen(pipe dept 1.) F a x : **6 ***********2 Email : ***** or : ***** Commercial Information: 1) Delivery : Within *0 days ; 2) Min Order : Carbon steel tube, 5 Tons; Alloy steel tube *5 Ton; 3) Packing way : As per our export standard for shipment ; 4) Term of payment : *0% T/T within 3 days after signing the contract, balance *0% before shipment. Or *0%T/T **0% irrepealable L/C ; 5) Delivery Port : Shanghai Port ; 6) Offer Validity : **7 Days ; 7) Container : *0&#**9; or *0&#**9;, etc ; 8) Manufacture methods : Cold Finished Method

Send a direct inquiry to this supplier

A:

Mr. green < jiangsu huacheng steel pipe making group. >

quiero saber: