¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
PU Waterproof Coating

PU Waterproof Coating

|

Minimum Order

Place of Origin:

Guangzhou

Price for Minimum Order:

-

Minimum Order Quantity:

1Tons

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

2000000 Tons

Payment Type:

-

Contactar ahora
Miembro Básico

Persona de contacto Ms. Terri

Rm203-204, Floor1,No.2,Huajinmingyuan, Luoxi New Town, Panyu District, Guangzhou, Guangdong

Contactar ahora

Description

DY***1 Polyurethane Waterproof Coating Illustration This kind of product is a newly developed high polymer waterproof material of the *0s, its main ingredient is polyurethane and other macromolecular substance. Its also the most perfect upgraded material among the domestic waterproof material, its performance index reaches the level of the like products of abroad. Features ***** resistance to moisture, non-toxicity, non-harmful , safety construction. 2.Liquid and cold construction , simple operation , perfect waterproof effects. ***** mechanical, stable weather resistance. Application 1.Various types of roofs: including cement , bamboo , timber , steel , asbestos shingle, and different shapes of roofs. 2.Underground structure: inner wall, exterior wall, bottom plate, elevation pit, retaining wall, underground tunnel , well, pipeline of underground concrete. 3.Surface structure: bridge, motorway, toilet, kitchen, bathroom, swimming pool, non-drinking pool, flowerbed. 4.Joint: expansion joint, construction joint, settlement joint, crack in the wall, spout. 5.Antisepsis: metal pipe, antiseptic terrace, antiseptic pool. Construction main points ***** base shall be strong, clean without dust 2.Whitings:blackings=1:2.5, putting blackings into the container first, then adding whitings and stiring well and thoroughly. 3.Knif-coating the base thoroughly with rubber scraper blade, the thickness of coating is 2.*0mm, and knifcoating in twice. ***** order to strengthen the cohesive force between the waterproof layer and protective layer, sprinkling coarse sand or stone grain on the surface before the second coating solidified . Cautions ***** having water on the base, dry first if having the water . 2.Shall be pressurized, running out within one day after unsealing. 3.Avoid from direct sunlight within 3 days if constructed on wet base.

Send a direct inquiry to this supplier

A:

Ms. Terri < Guangzhou Dayu Waterproof Co., Ltd >

quiero saber: