Product Name: H*5 Taper Drill
Rod Steel match with Chisel Cross Button Bit
Rods
Type:
- Effective Length:
**0mm****0mm (L)
- Shank: H*2 × **8mm, H*9 ×
**8mm
- Taper: 4.8°, 6°, 7°, *1°,
*2°
- Material: High quality steels
Advantages &
Service
The advantage of
H*5 Taper Drill Rod Steel match with Chisel Cross Button
Bit
- Strict quality control
- More reasonable factory price
- Better after-sales service
- Professional suggestion
- OEM service
Application:
The H*5 Taper
Drill Rod Steel match with Chisel Cross Button
Bit is
widely applicable to mining industry,
tunneling and underground engineering, open pit, construction
drill, blast industry, civil engineering operations, road, gas
line, pipe and trench projects, quarry work, rock anchoring and
ground stabilization projects, water well industry,
etc,.
Usage:
The tapered
drill rod which is matched with taper chisel bit, taper cross bit
and taper button bit, is mainly used for rock drilling, blasting
holes and other drilling works in the quarries, coal mines, traffic
and other constructions.
A wide taper
degree is normally used when drilling with high impact hydraulic
rock drills in medium hard to hard and abrasive rock
formations.
Generally,
the light-duty rock drill uses 7 taper or smaller taper degree, the
heavy-duty rock drill mainly uses *2 taper degree.
The tapered
drill rods have a tough life, transferring the percussion energy
from rock drill to drilling bit and then into the rock. They are
also subjected to high bending stress, not to mention corrosive
water in the flushing hole.
It is
forbidden to keep working when the tapered drill rod is bended,
otherwise the service life of the tapered drill rod would be
decreased.
If the
tapered drill rod was sheared, it can be restored by re-machining a
new taper.
Package &
Transportation
Package: Wooden box / Gunny
bag
Transportation: Sea freight
for bulk order. Air delivery for samples.
Buying Guide
- Confirm the detail measures,
quantity, colors and package.
- *0% deposit before production,
we accept T/T, Western Union.
- Start production after getting
deposit, generally it will take about *5 days to
finish.
- We send pictures to customers
for confirmation once it’s finished, customers prepare the rest
payment.
- We send goods by sea, and all
of original documents by air to customers.