FOB Price
Obtener el precio más reciente|
Minimum Order
Place of Origin:
chengdu
Price for Minimum Order:
-
Minimum Order Quantity:
1
Packaging Detail:
-
Delivery Time:
negotiation
Supplying Ability:
1
Payment Type:
-
Persona de contacto Mr. Xu
No 29,Dong yiduan ,Erhuan road, chengdu, Sichuan
It is used for the external welding on the pipe wall after the internal welding Adopting long range multiple wire (3 wire or 4 wire) sub-arc welding on the pipe external wall During the external welding, the pipe is still placed on the transfer trolley, and the trolley is stably moving under the welding head Cross slide is installed on the welding head, during the welding process it can realize vertical and horizontal direction adjusting to make the welding seam position centered, the welding speed is 0.*2m/min*1.2m/min