Precio FOB
Obtener el precio más reciente200 ~ 249 USD / Unit
|100 Unit Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
200 ~ 249 USD / Unit Obtener el precio más reciente
Lugar de origen:
No. 154, Section 3, Shidong Reading Gate, Longmatan District, Luzhou City, Sichuan Province
Precio de pedido mínimo:
200 per Unit
Cantidad de pedido mínimo:
100 Unit
Detalle de embalaje:
-
El tiempo de entrega:
15 to 20 days
Capacidad de suministro:
1000 Unit per Year
Tipo de pago:
-
Grupo de productos :
-
Persona de contacto Wang
Chengdu, Sichuan
1. HTF series fire high temperature smoke exhaust fan is a national
"Spark" project product, with excellent performance, high
temperature resistance, high efficiency, less floor space than
centrifugal fan, convenient installation and other
characteristics.
Smoke exhaust fan
Smoke exhaust fan
2. The HTF fire fan has excellent high temperature resistance
performance: the fan test meets the requirements of GBJ****2 fire
code standard, and an enterprise internal control assurance system
higher than this standard has been established. It can operate
continuously for more than *0 minutes under **0 ℃ high
temperature conditions, and not be damaged for *0 hours under **0
℃ temperature conditions. It is widely used in advanced civil
buildings, ovens, underground garages, tunnels and other
occasions.
3. The performance listed in the performance table of HTF fire fan
is the performance within the maximum efficiency range, which is
divided into five performance points according to the air volume.
The performance table shall prevail when selecting. The qualified
products of the ex-factory fire fan are under the rated air volume,
the error of the total pressure value is not more than ± 5%, and
the performance selection table is the performance under the
standard state, regardless of the technical documents or order
requirements.
País: | China |
N º de Modelo: | - |
Precio FOB: | 200 ~ 249 / Unit Obtener el precio más reciente |
Lugar de origen: | No. 154, Section 3, Shidong Reading Gate, Longmatan District, Luzhou City, Sichuan Province |
Precio de pedido mínimo: | 200 per Unit |
Cantidad de pedido mínimo: | 100 Unit |
Detalle de embalaje: | - |
El tiempo de entrega: | 15 to 20 days |
Capacidad de suministro: | 1000 Unit per Year |
Tipo de pago: | - |
Grupo de productos : | - |