Precio FOB
Obtener el precio más reciente( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
-
El tiempo de entrega:
-
Capacidad de suministro:
-
Tipo de pago:
PayPal, T/T
Grupo de productos :
-
Material:**4 stainless steel
Sampling depth:***0m
sampling volume: 3L or 5L
Sampling area:*5x*0cm
Nylon rope
:*0m
1. Determine sampling place.
2. Stretch grab bucket, put support rob into buckle and pull rope
closer, then the grab bucket will stay open condition.
3. Put the stretched grab bucket into river slowly, release rope
while contacting the river bottom, then the support rod will detach
with buckle under gravity effect.
4. Lift rope by strength and the stretched grab bucket will close
slowly. Lastly the bottom sediment will be collected inside grab
bucket while closing.
País: | China |
N º de Modelo: | - |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | - |
El tiempo de entrega: | - |
Capacidad de suministro: | - |
Tipo de pago: | PayPal, T/T |
Grupo de productos : | - |