¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
HFC Floor formwork (HFC Eco-friendly Floor formwork) HFC Floor formwork (HFC Eco-friendly Floor formwork) HFC Floor formwork (HFC Eco-friendly Floor formwork) HFC Floor formwork (HFC Eco-friendly Floor formwork)
Next

HFC Floor formwork (HFC Eco-friendly Floor formwork)

94 ~ 94 / Piece ( Negotiable )

|

290 Piece Minimum Order

País:

South Korea

N º de Modelo:

HFC Form 5

Precio FOB:

94 ~ 94 / Piece ( Negotiable ) Obtener el precio más reciente

Lugar de origen:

Republic of Korea

Precio de pedido mínimo:

94 per Piece

Cantidad de pedido mínimo:

290 Piece

Detalle de embalaje:

Export Standard Packaging

El tiempo de entrega:

30 to 45 Days

Capacidad de suministro:

10000 Piece

Tipo de pago:

T/T

Grupo de productos :

-

Contactar ahora
3rd Año

Persona de contacto Ms. Ella

309 Mokdong dong ro, Seoul, Yang Cheon Gu

Contactar ahora

Especificaciones del producto

  • Dimension:1000x740x125mm
  • Function:Girder Lower Concrete Form
  • Material:Highly functional plastic
  • Weight:25 kg

Descripción del producto

H.F.C Eco-friendly Floor formwork
( Certified Innovative product by K-PPS )
It was developed with the goal of drastically reducing costs and stabilizing the quality by substituting the high-functional composites floor formwork for the PSC girder construction. The H.F.C floor formwork is a plastic eco-friendly formwork that can reduce construction costs, improve workability as well as reduce logistics and storage costs with the optimized design of the girder type.
image

â–  Excellent cost saving
• Can be used semi-permanently repeatedly
• Reduced material costs by not using square lumbers(less than 3 times)
• Reduced logistics costs by the lighter floor form
â–  Better & easier construction
• Easier to install, dismantle, move, and store by standardization and integration
• 40% shorter construction period against conventional way
â–  Eco-friendliness
• Recyclable Plastic Formwork
• CO2 reduction by reducing construction time and activating eco-friendly materials
• Minimum environmental destruction(logging) due to non-use of square lumber

image

imageimage
Project references
â–  Construction
Project owner Main contractor Project name
KR Jinheung corporation Pohang Youngilman new port link project
KEC Boseong E&C Honamseon improvement project
Jeollanam-do   Songgwang stream improvement project
Heongseong-gun   Anheung-Saeje road project
LH Seohan Gwachen route 47 bypass project
Chilgok-gun   Pyungbok bridge project
LH Daewoo E&C Gwachen public housing district
KEC Posco E&C Ganjin-Gwangju expressway project (sec 2)
KEC Gyoungnam corporation Hamyang-Hapcheon expressway project (sec 8)
â–  Design
Project owner Main contractor
KEC Inju-Yumchi expressway project (sec 2)
Gimhae-si Chojeong-Hwamyun linking road project
KEC Daesan-Dangjin expressway project (sec 3)
LH Road adjacent to Anyang stream project
KEC Ganjin-Gwangju expressway project (sec 1~7)
※ KEC: Korea Expressway Corporation, KR: Korea National Railway
※ PPS:Public Procurement Service

 

País: South Korea
N º de Modelo: HFC Form 5
Precio FOB: 94 ~ 94 / Piece ( Negotiable ) Obtener el precio más reciente
Lugar de origen: Republic of Korea
Precio de pedido mínimo: 94 per Piece
Cantidad de pedido mínimo: 290 Piece
Detalle de embalaje: Export Standard Packaging
El tiempo de entrega: 30 to 45 Days
Capacidad de suministro: 10000 Piece
Tipo de pago: T/T
Grupo de productos : -
HFC Floor formwork (HFC Eco-friendly Floor formwork)
HFC Floor formwork (HFC Eco-friendly Floor formwork)
HFC Floor formwork (HFC Eco-friendly Floor formwork)
HFC Floor formwork (HFC Eco-friendly Floor formwork)

Send a direct inquiry to this supplier

A:

Ms. Ella < NICE D AND B Co., Ltd. >

quiero saber: