Precio FOB
Obtener el precio más reciente1 USD / Piece
|1 Piece Minimum Order
País:
China
N º de Modelo:
by selection
Precio FOB:
1 USD / Piece Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
1 per Piece
Cantidad de pedido mínimo:
1 Piece
Detalle de embalaje:
packed by pallet or carton
El tiempo de entrega:
60 to 90 days
Capacidad de suministro:
400 Ton per Month
Tipo de pago:
T/T
Grupo de productos :
Persona de contacto Elva
Huaqiao Technology Park, Huashan,, Guangzhou, Guangdong
Features:
1, Product name: Hammer plate
2, Hardness: Decided by the material
3, Production capability: More than***0tons/year
4, Material:
Cr*2Mo2, Cr*2Mo1,Cr*8, Cr*5, martensite
Standards as following: JIS, DIN,
ASTM, BS
5, Molding processing: Sand casting
6, Melting facilities: Medium frequency electric induction
furnace/electric arc furnace.
7, Casting Inspection: Direct-reading spectrum instrument,
metallographic analysis, ultrasonic inspection, magnetic particle
inspection, mechanical properties inspection.
8, Heat treatment facilities: Special heating electric furnaces,
special water pools etc. Special quenching equipments.
9, Surface treatment: Shot blast cleaning.
*0, Industry categories: Mining machinery, construction machinery,
mineral processing, structural shredder parts, and others.
*1, Representative products: Jaw plate, cheek plate, toggle plate,
blow bar, mantle, concave, hammer.
HS Code: ********0
Trademark: GZDS
Model No.: PF
Standard: CE
Productivity: **0 Tons/month
Unit Price: Negotiation
Shipment Terms: In ****0 Days
Minimum Order: 1 PC
Origin: China
Packing: Standard Exporting Package
Mining Object: Coal Machinery
Type: Crushing Equipment
Export Markets: North America, South America, Eastern Europe,
Southeast Asia, Africa, Oceania, MID East, Eastern Asia, Western
Europe
País: | China |
N º de Modelo: | by selection |
Precio FOB: | 1 / Piece Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 1 per Piece |
Cantidad de pedido mínimo: | 1 Piece |
Detalle de embalaje: | packed by pallet or carton |
El tiempo de entrega: | 60 to 90 days |
Capacidad de suministro: | 400 Ton per Month |
Tipo de pago: | T/T |
Grupo de productos : | Hi-Chrome part |