Precio FOB
Obtener el precio más reciente100000 ~ 500000 USD / Unit ( Negotiable )
|1 Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
100000 ~ 500000 USD / Unit ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
100000 per Unit
Cantidad de pedido mínimo:
1
Detalle de embalaje:
Duly package for export
El tiempo de entrega:
90days
Capacidad de suministro:
200 Unit per Year
Tipo de pago:
T/T
Grupo de productos :
Persona de contacto Mr. Jack
Tongzhou, Beijing, Beijing
The configuration of this melting furnace is as follows:
1. The type of this melting furnace is
regenerative and natural gas reflective. The furnace chamber is
circular. The aluminium ingot and scrap are charged from the top
with movable top cover. The two furnace doors lifted by motor are
mainly for metal mixing and slag removing.
2. Burning system: This melting furnace uses the
advanced PLC automatic control system and the regenerative burner
with high efficiency, energy saving and environmental protection.
The operation, real-time monitor of operating condition, record and
gathering of key parameters are through the touch screen.
3. The melting bath of furnace body uses the
grade 1 high alumina brick (AL2O3≥*5%), anti seepage castable and
light heat insulating brick etc. The furnace cover is cast with
light mullite.
4. The furnace door is cast with high strength
and wear resistant castable.
5. The material of molten metal exit port is high
alumina. The molten metal is released manually.
6. The furnace hearth inclines toward the outlet
hole. The outlet hole is at the lowest position so that the molten
metal can fully flow out.
7. The launder between the melting furnace and
the holding furnace is used for the molten metal to flow from the
melting furnace to the holding furnace.
País: | China |
N º de Modelo: | - |
Precio FOB: | 100000 ~ 500000 / Unit ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 100000 per Unit |
Cantidad de pedido mínimo: | 1 |
Detalle de embalaje: | Duly package for export |
El tiempo de entrega: | 90days |
Capacidad de suministro: | 200 Unit per Year |
Tipo de pago: | T/T |
Grupo de productos : | Metal process unit |