Precio FOB
Obtener el precio más reciente2 ~ 5 / Square Meter
|1000 Square Meter Minimum Order
País:
China
N º de Modelo:
CLB-1200
Precio FOB:
2 ~ 5 / Square Meter Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
2 per Square Meter
Cantidad de pedido mínimo:
1000 Square Meter
Detalle de embalaje:
-
El tiempo de entrega:
15 to 20 days
Capacidad de suministro:
50000 Square Meter per Day
Tipo de pago:
-
Grupo de productos :
Persona de contacto Mr. Colin
Wensheng Street, Weifang, Shandong
Description
The products are made by soaking the base thermoplastics (such as a tactic polypropylene-APP,APAO.APAL) modified bitumen, then covering double faces with elastomeric (SBS)or thermoplastics (APP,APAO,APAL)modified bitumen, and last finishing the upward face with fine sands, mineral slates or polythene membrane etc. While downward face with fine sands or polythene membrane, It has good waterproofing and ageing-resistance function, not flowing at highest temperature and no crack at lowest temperature; easy application, no pollution, and long service life, etc .APP modified bitumen waterproof membrane is specially suitable to the building waterproofing in cold area and to the buildings of changeable constructions, while APP specially suitable to high temperature and strong sun-shining.
It has good waterproofing and ageing-resistance function, not flowing at highest temperature and no crack at lowest temperature; no pollution, and long service life, etc. SBS modified bitumen waterproof membrane is specially suitable to the building waterproofing in cold area and to the buildings of changeable constructions, while APP specially suitable to high temperature and of atrong sun-shining.
Application
Make sure the roof deck smooth, and dry (moisture< 9%), then
apply the surface oroof deck homogeneously with a kind bitumen
paint, till dry to start application.
There are two methods in application:
a.One way is by heating and melting method. Heat the polyethylene
film of the membrane and roof deck surface by heating and melting
method to be nearly melted (not flowing), then install the
membrane filly bonded to the roof deck with overlaps of
5-250px.b. The other way is by cold adhesive method. Pour the
cold adhesive homogeneously on the roof deck, then roll the
membrane to install it to be fully slicked to roof deck.By
heating and melting method and by cold adhesive can be used in
alternation in application as requested.
after application, a full serious inspection is required to sure
no air bubble, no falling away, etc. to guarantee the waterproof
life.
Storage
Storage and transportation, the different types and specifications of the products should be stacked separately and
should not be mixed. The storage temperature should not be higher than 50 ° C, stand up storage height of not
more than two layers;
Storage and transport of different types and specifications of products should be stacked separately and should not
be mixed. The storage temperature should not be higher than 50 ° C, stand up storage height of not more than
two layers;
normal storage conditions of transport, storage from the period from the date of production for one year.
País: | China |
N º de Modelo: | CLB-1200 |
Precio FOB: | 2 ~ 5 / Square Meter Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 2 per Square Meter |
Cantidad de pedido mínimo: | 1000 Square Meter |
Detalle de embalaje: | - |
El tiempo de entrega: | 15 to 20 days |
Capacidad de suministro: | 50000 Square Meter per Day |
Tipo de pago: | - |
Grupo de productos : | Bitumen membrane |