Precio FOB
Obtener el precio más reciente20000 ~ 80000 USD / Set
|1 Set Minimum Order
País:
China
N º de Modelo:
lz-xc
Precio FOB:
20000 ~ 80000 USD / Set Obtener el precio más reciente
Lugar de origen:
foshan, china
Precio de pedido mínimo:
20000 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
plastic film or discussed
El tiempo de entrega:
30 to 40 days
Capacidad de suministro:
10 Set per Month
Tipo de pago:
-
Grupo de productos :
Persona de contacto Ms. Sarah
yanbu, Foshan, Guangdong
*4/*6 mold station pu shoe machine sole insole molding machine with
rotary production line
Product Application
This equipment is used to produce polyurethane insoles, outsoles, high heels, leather shoes, casual shoes, safety shoes, travel shoes,slippers, sandals, flip flops and other all kinds of polyurethane shoes.
Product Component
This equipment includes one three components low pressure
pu foam machine and one automatic banana-type production
line. According to the client's production capacity, the
production line has *4, *6, *0,
*0,**0,**0
or other mold stations for choose.
Why choose it:
1. Most of the components are imported, like the metering pump and electrical components, greatly enhancing equipment running reliability and service life;
2. The moulds can be opened and closed automatically by the pneumatic system which can save the labor cost and around 2~4 people are required for the production only.
3. The molds are heated by circulating water heating system, it can save 3/2 electricity compared with the traditional manual machine, it also makes the temperature of the molds stabler.
4. the injection can be or can not be robotic control,
which is customized for the
client.
Contact: Sarah Chen
mobile/wechat/whatsapp: ***************9
Email: *@********************an>
País: | China |
N º de Modelo: | lz-xc |
Precio FOB: | 20000 ~ 80000 / Set Obtener el precio más reciente |
Lugar de origen: | foshan, china |
Precio de pedido mínimo: | 20000 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | plastic film or discussed |
El tiempo de entrega: | 30 to 40 days |
Capacidad de suministro: | 10 Set per Month |
Tipo de pago: | - |
Grupo de productos : | shoe making machine |