Precio FOB
Obtener el precio más reciente15 ~ 23 USD / Piece ( Negotiable )
|1000 Piece Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
15 ~ 23 USD / Piece ( Negotiable )Obtener el precio más reciente
Lugar de origen:
HEBEI
Precio de pedido mínimo:
15 per Piece
Cantidad de pedido mínimo:
1000 Piece
Detalle de embalaje:
45%CKD , 85%SKD
El tiempo de entrega:
WITHIN 25 DAYS
Capacidad de suministro:
10000 Piece per Month
Tipo de pago:
Money Gram, L/C, T/T
Grupo de productos :
-
Persona de contacto john
Pingxing bicycle industry zoon, Xingtai, Hebei
Â
1. Rim Size: from *2" *6" *0"
2. Bike Frame: steel and painting, thicker argon-arc welding/CO2 welding
3. Bike Fork: steel and painting, co2 welding steel /suspension fork
4. Rim: *2" *6" *0" steel alloy or aluminum
5. Handlebar and stem: CP, argon-arc welding Φ*2X0.**1.2mm
6. Tyre: *2"x1.*5, *6"x1.*5, *0x1.*5 or 1.*5 2.**5 air tires or EVA tire
7. Chain wheel & crank: *2"*4T×*9/***8T×**2/*0"*8T×**7 CP/ED
8. Crank: CP or ED or UCP
9. Brake: F/R Caliper Brake or R band brake
*0. Freewheel: *6T/*8T/*0T Brown/Black/CP
*1. Mudguard: steel, painting or CP
*2. Chain: full chain or *-form chain cover
*3. Pedal: plastic, with reflector, without ball, PP/TPE/ALLOY
*4. Saddle: good leather, common or spring /plastic/imitation leather/ plate PVC TOP
*5. Grips: PVC/TPR/RUBBER FOAM
*6. B.B parts:3pcs B.B axle B.B cup
*7. Paint: 3X/4X painting
*8. Color: red, black, blue, green, yellow etc. any color you like
*9. Attachments: bag, helmet, flag, the covers of the wheels, training wheels
*0. Packing: export standard packing   SKD/CKD/AB   *5%SKD/*0%SKD 1PCS/CTN or
4PCS/CTN
The quantity in one *0 HQ container:
    *5% skd, 1pcs 1 carton, *2 ***0 pcs;  *4 ***0 pcs;  *6 **0 pcs
    *0% skd, 1pcs 1 carton, *2 ***5 pcs;  *4 ***0 pcs;  *6 ***5 pcs
País: | China |
N º de Modelo: | - |
Precio FOB: | 15 ~ 23 / Piece ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | HEBEI |
Precio de pedido mínimo: | 15 per Piece |
Cantidad de pedido mínimo: | 1000 Piece |
Detalle de embalaje: | 45%CKD , 85%SKD |
El tiempo de entrega: | WITHIN 25 DAYS |
Capacidad de suministro: | 10000 Piece per Month |
Tipo de pago: | Money Gram, L/C, T/T |
Grupo de productos : | - |