Precio FOB
Obtener el precio más reciente280 ~ 300 / Cubic Meter
|22 Cubic Meter Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
280 ~ 300 / Cubic Meter Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
280 per Cubic Meter
Cantidad de pedido mínimo:
22 Cubic Meter
Detalle de embalaje:
3*6*2 strips
El tiempo de entrega:
15 to 20 days
Capacidad de suministro:
3000 Cubic Meter per Month
Tipo de pago:
T/T, L/C
Grupo de productos :
-
Persona de contacto Daisy
Linyi, Shandong
Why build with OSB?
1) It is durable and efficient, fast and cheap.
2) The material is easy to process and assemble; a medium-sized house can be built in several weeks.
3) The low weight of the construction means saving concrete and other materials which are necessary for a traditional foundation.
4) The thermal insulation of a construction which uses OSB is much higher.
5) increased resistance to earthquakes due to the flexibility of the material and the low weight of the construction.
País: | China |
N º de Modelo: | - |
Precio FOB: | 280 ~ 300 / Cubic Meter Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 280 per Cubic Meter |
Cantidad de pedido mínimo: | 22 Cubic Meter |
Detalle de embalaje: | 3*6*2 strips |
El tiempo de entrega: | 15 to 20 days |
Capacidad de suministro: | 3000 Cubic Meter per Month |
Tipo de pago: | T/T, L/C |
Grupo de productos : | - |