Precio FOB
Obtener el precio más reciente5,000 / Set
|1 Set Minimum Order
País:
China
N º de Modelo:
ZDL chicken vertical scalding tank of poultry slaughtering equipment
Precio FOB:
5,000 / Set Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
5, 000 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
according to the demand of customers or being negotiable
El tiempo de entrega:
30-60 days after the confirmed order or being nego
Capacidad de suministro:
1 Set per Month
Tipo de pago:
T/T
Grupo de productos :
Persona de contacto Ada
Weifang, Shandong
1. ZDLchicken vertical scalding tank of poultry slaughtering equipment uses the stainless steel material completely,conforms to food sanitation standard
2.uses the seal box wirting style structure, reduce the lost of steam
3.uses the heat change way, avoids scalding birds badly
4.the air operated turbulent flow agitation, the water temperature is enven
5.equipment can be assembly, may according to need assemble different tyle.
style | ZDL*5 | ZDL*0 | ZDL*0A |
Scalding capacity(pcs/n) | ***0 | ***0 | ***0 |
Scalding time(s) | *****0 | *****0 | *****0 |
Steam pressure(After decompression)(pa) | ******0 | ******0 | ******0 |
Scalding temperature(°C) | ****2 | ****2 | ****2 |
Temperature control way | Automatic /Manual | Automatic /Manual | Automatic /Manual |
Heating way | steam | steam | steam |
The fluid position way | Automatic /Manual | Automatic /Manual | Automatic /Manual |
Agitation way | blower agitation | blower agitation | blower agitation |
Air bower | FM***4/0.*5**1, Wind volume:4m3/min, Wind pressure:*4kpa | FM***4/0.*5**1, Wind volume:4m3/min, Wind pressure:*4kpa | FM***4/0.*5**1, Wind volume:4m3/min, Wind pressure:*4kpa |
País: | China |
N º de Modelo: | ZDL chicken vertical scalding tank of poultry slaughtering equipment |
Precio FOB: | 5,000 / Set Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 5, 000 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | according to the demand of customers or being negotiable |
El tiempo de entrega: | 30-60 days after the confirmed order or being nego |
Capacidad de suministro: | 1 Set per Month |
Tipo de pago: | T/T |
Grupo de productos : | Slaughtering machinery |