Precio FOB
Obtener el precio más reciente|
1 Set Minimum Order
País:
China
N º de Modelo:
AS-2109
Precio FOB:
Lugar de origen:
shanghai
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
-
El tiempo de entrega:
50-60 working days
Capacidad de suministro:
-
Tipo de pago:
-
Grupo de productos :
-
Persona de contacto Ms. Tina
Xinshun, Shanghai, Shanghai
ALLSTAR MACHINERY:Z Purlin Forming Machine,Z Section Forming Machine,Z Shape Forming Machine
Introduction of Z Purlin Roll Forming Machine,Z Profile Roll Forming Machine,Z Channel Roll Forming Machine,Z Beam Roll Forming Machine,Z Section Roll Forming Machine,Z Shape Roll Forming Machine,Z Steel Roll Forming Machine:
This metal rolling forming equipment is mainly composed of manual stacker, the pedestal of the stacker, the feed leading table, flattening device, the main forming machine, punching device, cutting device, hydraulic station, computer control device.
Product features of C, Z purlin machine:
1. The product of the machine offers high compressive strength
and good straightness.
2. High automatization, like auto cutting and punching
3. Quick and convenient installation helps reduce labor force.
Product application of C, Z purlin machine:
Product of this metal forming machine is widely used in load bearing roof and buttree of large and medium-size industrial and civilian buildings, like workshop, warehouse, locomotive shed, hanger, exhibition building, theatre, stadium etc.
Technical Specification of C, Z purlin machine:
1 Installation size: ****0mm×***0mm×***0mm
2 Quantity of stands: *5
3 Roller material: Gcr*5
4 Main motor power: *1KW
5 Hydraulic station power: *1KW
6 Hydraulic station pressure:****0Mpa
7 Forming speed: ***0m/min.
8 Material of blade: Cr*2
9 Electrical system: PLC variable frequency control
*0 Thickness of the plating chromium of roller surface:
0.*5mm
*1 Thickness range: 1.**3.0mm
*2 Rolling spec.: spec. of *****0
*3 Uncoil width: ***0mm
*4 Precision of length: ****0mm±2mm
País: | China |
N º de Modelo: | AS-2109 |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | shanghai |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | - |
El tiempo de entrega: | 50-60 working days |
Capacidad de suministro: | - |
Tipo de pago: | - |
Grupo de productos : | - |