Precio FOB
Obtener el precio más reciente( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
FBF
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
1.Mechanical parts are bare packing. 2.Electrical parts are packing in vacuum. 3.Veneer wood package
El tiempo de entrega:
30 days after receiving the deposit
Capacidad de suministro:
2 Unit per Month
Tipo de pago:
L/C, T/T
Grupo de productos :
Persona de contacto Ms. Joan
No. 58 Xinfeng Road,Mei Village, Xinwu District, Wuxi, Jiangsu
Overview
1. Apply composite flow type cooling way with high-efficiency
dewaterer and low drift water rate
2. Cooling medium circulates closely with no impurities entering,
ensuring the pureness of the medium
3. The circulating water applies soft water, which wont scale or
block pipeline
4. Spray the outer wall of the condenser wet completely with spray
water, avoiding forming scale at dry points and improving the
system efficiency to the highest degree.
5. Cover a little area and can be moved and laid according to
requirement, maintenance cost is low.
6. Composite flow type cooling tower is energy-saving type cooling
tower of which the water in the condenser can flow back to the
water tank to ensure the equipment wont be freezen off when the
equipment doesnt operate in lower temperature in northern area.
7. Automatic digital vision temperature control, saving energy and
protecting environment
Product structure
Closed cooling tower combines the function of cooling tower and
heat exchange together. It reduces the temperature of process fluid
till it is close to air wet bulb temperature. When the system
works, process fluid for cooling will flow inside of serpentiform
coil of heat exchanger. The spray system is outside for moistening
coil surface continually.
Structure
details:
1. The main engine of closed cooling tower is composed of parts
including shell, heat exchanger, fan, spray water pump, water
collector, flume and pipe valve.
Closed cooling tower combines the function of cooling tower and
heat exchange together. It reduces the temperature of process fluid
till it is close to air wet bulb temperature. When the system
works, process fluid for cooling will flow inside of serpentiform
coil of heat exchanger. The spray system is outside for moistening
coil surface continually. The water spraying on the coil flows to
PVC heat exchange layer with efficient cooling effect for cooling.
Then, it falls on water collection tray for recycling. Meanwhile,
the air is sucked and it passes the coil and PVC heat exchange
layer so as to make some water evaporated. All moisture in airflow
is collected by splash eliminator and then it is sent back to water
collection tray. After that, it is evaporated and the heat is
carried away from spray water. As a result, the coil and process
fluid in the coil are cooled.
2. The new and unique coil design applies serpentiform coil and
guarantees certain inclination angle. As a result, when the coil is
not used, the medium water in the cooler can be discharged
completely so coil cannot be frozen after shutdown in winter for
users in the north and service life of cooler can be prolonged.
3. There is unique inclination, efficient dehydration and low win
resistance dehydrator; this unique patent dehydrator design
guarantees efficient dehydration (high evaporation and reduces
consumption of spray water) on one hand. It can reduce wind
resistance of fan and make the design become more reasonable on the
other hand.
In order to guarantee long term and stable operation of closed
cooling tower, our company follows perfect ISO***1 international
quality assurance system procedure and CTI standard on each link of
design, selection, production and purchased parts. We strictly
follow all specifications and make products meet design and
operation requirements finally.
País: | China |
N º de Modelo: | FBF |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | 1.Mechanical parts are bare packing. 2.Electrical parts are packing in vacuum. 3.Veneer wood package |
El tiempo de entrega: | 30 days after receiving the deposit |
Capacidad de suministro: | 2 Unit per Month |
Tipo de pago: | L/C, T/T |
Grupo de productos : | closed cooling tower |