Descripción del producto
Features
1ã€Intelligent
controlled by industrial MCU
2ã€Multiple
control modes for load, such as light control, light-timer control,
and manual control..
3ã€Wind-Solar
complementary charge and control.
4ã€Increase
generation efficiency byboosting the charge voltage into a secondary power storage, to save more power in
breeze circumstance.
5ã€PWM
charging, a scientific battery management system
6ã€LEDs
and *-segment display the real-time status of the
controller
7ã€Multiple
battery protections against overcharge, overdischarge, overload,
short circuit and reverse
8ã€Self-adapt
*2V/*4V battery management system. (For lead-acid battery only,
lithium battery is forbidden.)
9ã€Electromagnetic
brake and power unloading to protect the wind generator and the
battery
Functions
1ã€Self-adapt
*2V/*4V battery management system. Connect the controller to a *2V
battery, and push the Power Switch , the *-segment will auto
show “1” ( or “2” for to the *4V one) in first 5 secs
.
2ã€Voltage
step-up charge. The controller will step-up the charge voltage to
****8V automatically when the output voltage of the wind generator
is lower than *2V or *4V in breeze circumstance.
3ã€Electromagnetic
brake and power unloading. The controller will start the brake and
power unloading protection when the output voltage of the wind
generator is over *2V or *4V.
4ã€LED
indication.
A〓CHARGE” Indicator. It will be ON when apply the controller
an voltage(from wind generator or solar panel), and OFF when
no Voltage, and flash
slowly when the battery is charged, and flash quickly when the battery
is overcharged and the charging circuit
will be opened.
B〓BATTERY”
Indicator. It will be ON when the
battery voltage is normal, FLASH SLOWLY when the battery is
under-voltage, FLASH QUICKLY when the battery is over discharged
and the load will be cut off.(The load will be resumed when the
battery voltage is recovered to *2.5V)
C〓OUTPUT”Indicator.
It will ON when the load is working and OFF when no load, FLASH
SLOWLY when over current (The load circuit will be cut off *0
seconds later when the current is 1.*5 times the rated current or 5
seconds later when the current is 1.5 times the rated current, LED
will keep flashing slowly), FLASH QUICKLY when the load is short
circuit and load circuit will be cut off. Other functions will not
be affected even the load circuit is cut off.
5ã€Multiple
Control Modes.
Aã€Light
control. When there is no
sunlight, load circuit will be closed within 3 minutes . When there
is sunlight, load circuit will be opened within 3
minutes.
Bã€Ligh-Timer control. A plus timer-control function based on the
Light-control function above. That is, the controller starts timing
as soon as the load circuit closed, and opens the load circuit as
soon as your desired preset time is up
Cã€Manual
control.
Close/Open the load circuit by
pushing the “Function Select” .
Dã€Quick
Check.
Load circuit will be opened when the
controller gets a charge voltage, and closed otherwise. This is a
shortcut to check the controller’s & output if
functioning properly.
Eã€Always-on mode. The load circuit is closed always.
PS: A solar panel is necessary in
the light control mode and in the light-timer control
modes
Mode
Setting
1ã€Press the
“Function Select” and hold on for more than 2 seconds, the
*-segment will flash and the controller is under the condition
of mode setting.
2ã€Then press
the “Function Select” to select the mode you want, and press
it again for 2 seconds long to confirm your setting, the will stop
flashing and indicates the mode you have selected for 2
seconds.
3ã€If you want
to check which kind of mode you have set before, press the
“Function Select” for less than 2 seconds, the
*-segment will ON and indicates the mode that has been
set.
Installation 1ã€Prepare
wire. Choose wire that is matching with the current.
2ã€Connect
battery. Don’t reverse the polarity. 3ã€Connect
solar panel. Don’t reverse the polarity. 4ã€Connect
wind generator. Connect three wires of the turbine to the A,B,C
ports of the controller. 5ã€Connect
load. Connect the load to the “Output” port, don’t reverse the
polarity, make sure the maximum output current is under the rated
current. 6ã€Turn on the
controller and set the control mode you want.
Uninstallation
1〠turn
off the controller 2〠disconnect
the wind generator 3〠disconnect
the solar pannel 4〠disconnect
the battery
País: |
China |
N º de Modelo: |
JDX-10A/500
|
Precio FOB: |
50 / Piece (Negociable)
Obtener el precio más reciente
|
Lugar de origen: |
Jiangmen,Guangdong,China |
Precio de pedido mínimo: |
50 per Piece |
Cantidad de pedido mínimo: |
10 Piece |
Detalle de embalaje: |
carton for export |
El tiempo de entrega: |
30 days |
Capacidad de suministro: |
500 Piece per Month |
Tipo de pago: |
L/C, T/T |
Grupo de productos : |
Wind-Solar Generating System Component
|