Precio FOB
Obtener el precio más reciente38500 / Unit
|1 Unit Minimum Order
País:
China
N º de Modelo:
JZJ-1003
Precio FOB:
38500 / Unit Obtener el precio más reciente
Lugar de origen:
Xinxing,Henan,China
Precio de pedido mínimo:
38500 per Unit
Cantidad de pedido mínimo:
1 Unit
Detalle de embalaje:
One 40 HQ and 20GP
El tiempo de entrega:
20 Days
Capacidad de suministro:
10 Unit per Month
Tipo de pago:
T/T, L/C
Grupo de productos :
Persona de contacto Jenny
YuLin Park, Xinxiang, Henan
External dimension of main machine(Diameter*Length)
***0****0mm, ***0****0mm, ***0****0mm
Raw material
Waste tire , Waste rubber, Waste plastic
Oil yield/day
Waste tire/rubber
Big tyres
*5%**0%
Car tyres
*0%
Bicycles and motorcycles tyres
*0%**5%
Waste Plastic
Fishing net ,
safety net, farm-oriented film
*5%**0%
Convenient bags, weave bags
*0%
Off-cut of recycled paper mill
*0%**0%
Structural Form
Horizontal
Capacity/day
**2 batch/day
Equipment Type
Universal Equipment
Operating pressure
Ordinary pressure
Power
Coal ,fuel gas , fuel oil , charcoal
Mode of cooling
Water-cooling
Working form
Continuous
*4 hour disposal amount
5/8/*0 tons raw material
*4 hour oil yield
Depends on oil output rate
Rotate speed of main equipment
0.4 turn/m
Power in total
9 KW/hour
Heating mode
Direct heating
Domestic pioneer of this technology
a. In its key installment decomposition processor design, has thoroughly overcome the disadvantages of the domestic present vertical flat base split processor, such as bottom partial being heated non-uniformity, easy to break, low output, short service-life is short and so on, the main engine uses horizontal-type **0ostructure*0.4 R/M
b. Fast practical feed-in and discharge system. The highest feed-in quantity of the XY*5 every *4 hour achieved 5 tons, Discharge time for **0kg carbon black only needs *0 minutes. The highest feed-in amount of the integral unit equipment every *4 hours achieves *5 tons.
c. Highly effectively gas&
País: | China |
N º de Modelo: | JZJ-1003 |
Precio FOB: | 38500 / Unit Obtener el precio más reciente |
Lugar de origen: | Xinxing,Henan,China |
Precio de pedido mínimo: | 38500 per Unit |
Cantidad de pedido mínimo: | 1 Unit |
Detalle de embalaje: | One 40 HQ and 20GP |
El tiempo de entrega: | 20 Days |
Capacidad de suministro: | 10 Unit per Month |
Tipo de pago: | T/T, L/C |
Grupo de productos : | 8tons Waste Tyre Pyrolysis Plant |