¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Tool Steel Round Bar
Next

Tool Steel Round Bar

|

5 Ton Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

Lugar de origen:

CHINA

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

5 Ton

Detalle de embalaje:

black painted, ends saw cut

El tiempo de entrega:

30~60 days

Capacidad de suministro:

2000 Ton per Month

Tipo de pago:

Other, PayPal, Money Gram, L/C, T/T

Grupo de productos :

Contactar ahora
Miembro Básico

Persona de contacto Mr. james

2820,Yiwu Mansion,No.38 Huizhou Avenue,, Huizhou, Guangdong

Contactar ahora

Especificaciones del producto

  • SEP1921 D/d:anti rust painted
  • well bundled:EFS,EFS+VD,ESR

Descripción del producto


tool steel round bar 1.***9,D2,Cr*2Mo1V1,SKD*1
steel,steel metal,metal steel,die steel, tool steel,good performance,long life span,competitive price,fast delivery,excellent after sale service.

1.***9 X**5CrVMo***1 is a high carbon, high chromium, molybdenum, vanadium, air hardening tool steel which offershigh surface hardness, good wear resistance, through hardening properties, dimensional stability and high resistance to tempering effect. 1.***9 X**5CrVMo***1 tool steel is also suitable for vacuum hardening.


 Typical Analysis  1.***9  X**5CrVMo***1

 C.

Si.

Cr. 

Mo. 

V. 

 1.*0%

0.*0% 

*2.*0% 

0.*0

0.*0

Forging:
Heat slowly and uniformly to **0°C then more rapidly to **0/***0°C.  After forging 1.***9 cool slowly.

Annealing:
Anneal at **0°C and slow furnace cool. Hardness after annealing will be approx. **5 brinell.

Hardening: 
Pre heat the 1.***9 component slowly to **0/**0°C and thoroughly soak. Continue heating to the final hardening temperature of ***0/***0°C and allow the component to be heated through. Quench in oil or cool in air.

Tempering:
Heat uniformly and thoroughly at the selected tempering temperature and hold for at least one hour per inch of total thickness. Double tempering of 1.***9  is recommended to be carried out with intermediate cooling to room temperature.

 

Tempering °C

**0

**0

**0

**0

**0

**0

HRc

*2/*1

*1/*0

*0/*9

*7/*6

*6/*5

*6/*5


Stress Relieving:
If machining operations have been heavy or if the 1.***9 tool has an unbalanced section, remove stresses before hardening by heating up to **0°C, equalise, then cool slowly.

Hard Chromium Plating:
After hard chromium plating tempering of 1.***9 tool steel is recommended at **0°C for 4 hours to avoid hydrogen embrittlement.  Tempering is to be performed immediately after chromium plating.

Welding:
Due to the high risk of crack formation welding of 1.***9 tool steel should be avoided, if possible. When, howe ver welding is essential, the following serves as a guide:

A.   Welding of soft annealed 1.***9 tool steel. 
·       Preheat to **0 - **0°C
·       Weld at ******0°C
·       Immediately stress relieve
Electrode: Cr-Mo alloy electrode for welding structural steel.

B.    Welding in connection with hardening of soft annealed 1.***9 tool steel.
·       Heat to austenitizing temperature.
·       Cool to approx. **0°C
·       Weld at approx. **0°C
·       Cool to approx. **0°C in the same way as at normal hardening, then temper to desired hardness. Double tempering will
     reduce the risk of crack formation.
Electrode: Hard facing electrode.

C.    Repair welding of 1.***9 tool steel in hardened and tempered condition.
·       Preheat to the tempering temperature (min. **0°C) previously used.
·       Weld at tempering temperature
·     Heat immediately to tempering temperature, but max. **0°C. Soaking time 2 hours.
Electrode: Hard facing electrode.


País: China
N º de Modelo: -
Precio FOB: Obtener el precio más reciente
Lugar de origen: CHINA
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 5 Ton
Detalle de embalaje: black painted, ends saw cut
El tiempo de entrega: 30~60 days
Capacidad de suministro: 2000 Ton per Month
Tipo de pago: Other, PayPal, Money Gram, L/C, T/T
Grupo de productos : cold die steel

Send a direct inquiry to this supplier

A:

Mr. james < Huizhou Xingye Special Steel Co., Ltd >

quiero saber: