Precio FOB
Obtener el precio más reciente( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
JLG23-B800
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
Guangdong
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
plastic bag+shaped white foam+export paper carton
El tiempo de entrega:
within 5 days for small order
Capacidad de suministro:
5000 Set per Month
Tipo de pago:
PayPal, Western Union, L/C, T/T
Grupo de productos :
Persona de contacto Ms. Lucy
No2 Nanhe, shunde Foshan, Guangdong
Foshan L.B Co., Ltd. located in
the center of building material-Foshan China. Focusing on all kinds
of HVAC products, etc. Our main products including:
Various of die-casting
aluminum radiators,
new design aluminum radiators,
Gas boilers,
TRVs (thermostatic radiator valves),
Steam generators,
Swimming pool heat exchangers,
manifolds,
pipes
*****************************************************-
1) The boilers are to have 2 functions – Heating & Hot water supply which work autonomously from one boiler. One mode is to heat the apartments. The other is to supply with hot water for apartments.
Both circulation rings are to be separated and to work in different temperature range.
2)Two heating models to select, they can change each other easily through "Model changer" on the bottom.
Floor heating: *0~*5°C;
Radiator: *0~*0°C,
it is free to set up the temperature.
3)Domestic hot water is prior. When hot water faucet is opened the gas boiler convert from Heating mode to Domestic hot water mode and modulating gas valve allows to heat water evenly. Gas boiler continue to heating water until the source is closed and then The boiler return to Heating mode or standby smoothly.
Above conversion be controlled automatically by Microcomputer inside boiler.
4) Anti-freeze protection measure. When the room temperature drop to below 7°C the circulating water pump operate and modulating gas valve allows to warm the water to *0°C then boiler stop working.
Above operation also be controlled automatically by Microcomputer inside boiler.
5)Pressure release valve. When the Heating system pressure reach to 3 bar the safety valve will be opened to relief the high pressure automatically.
6)Balanced
flue,means
Admission pipe inside the Exhaust pip like the concentric
circles.
Its advantage is not
only discharge the exhaust gas outside but also consume the
outdoor fresh air instead of indoor. Moreover the high temp
exhaust gas can preheat cold outside air that can increase
the boiler heat efficiency.
OTHER
FEATURES:
**4stainless steel burner
various capacity offer
CE standard quality
Microcomputer control
Heating&Hot water
Hot water Prior
safe with longer life time
elegant design
anti-freezing protection
heating&shower double function
domestic hot water system
País: | China |
N º de Modelo: | JLG23-B800 |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | Guangdong |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | plastic bag+shaped white foam+export paper carton |
El tiempo de entrega: | within 5 days for small order |
Capacidad de suministro: | 5000 Set per Month |
Tipo de pago: | PayPal, Western Union, L/C, T/T |
Grupo de productos : | GAS BOILER |