Precio FOB
Obtener el precio más reciente( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
DZJ-240
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
fujian
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
wood crates
El tiempo de entrega:
Lead time 15-25days
Capacidad de suministro:
20 Set per Day
Tipo de pago:
D/A, L/C, T/T, D/P, Western Union, Money Gram, PayPal, Other
Grupo de productos :
Persona de contacto Melody
Rm 139 No .100 Nanshan road, Xiamen, Fujian
Project situation: Totally invest **9.8 hundred million into Jiashao crossing sea bridge. The whole line is designed 8 lane according to express way construction standard. Plan to open the traffic in ***2. The bridge is from South lake transbay- the crossing of Fu hang yong express road and the Zhe Jia Su express road, to Gu zhu transbay –the crossing of Fuyong express way and Shangsan express way. The bridge crosses Ch'ien-t'angRiver and the whole lenth is *9.**2km. The main road lenth is ***0m. It will be the longest and widest multi towel cable-stayed bridge in the world. Construction situation: The diameter of the steel pipe sheet is *******0mm. The driving depth is *2m**6m.Geology situation: silty sand
Specification:
Model | DZJ***0 |
Moter Power | **0 KW |
Eccentric Moment | ***4 Nm |
Driving Force | *****2 Kn |
Speed | ****0 r/min |
Amplitude | **7.*5 Mm |
Maximum Line Pull | **8 Kn |
Length | 2.0m |
Width | 1.9 m |
Height | 3.5 m |
Weight | ****0 Kg |
Project:
País: | China |
N º de Modelo: | DZJ-240 |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | fujian |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | wood crates |
El tiempo de entrega: | Lead time 15-25days |
Capacidad de suministro: | 20 Set per Day |
Tipo de pago: | D/A, L/C, T/T, D/P, Western Union, Money Gram, PayPal, Other |
Grupo de productos : | Electric vibratory hammer |