¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
STRIP GALVANIZING (ALLOY COATINGS)
Next

STRIP GALVANIZING (ALLOY COATINGS)

300 ~ 490 / Metric Ton

|

100 Metric Ton Minimum Order

País:

USA

N º de Modelo:

-

Precio FOB:

300 ~ 490 / Metric Ton Obtener el precio más reciente

Lugar de origen:

USA

Precio de pedido mínimo:

300 per Metric Ton

Cantidad de pedido mínimo:

100 Metric Ton

Detalle de embalaje:

in containers

El tiempo de entrega:

27 days

Capacidad de suministro:

500 Metric Ton per Week

Tipo de pago:

T/T

Grupo de productos :

-

Contactar ahora

GT LLC

USA

Miembro Básico

Persona de contacto Mr. Gary Michael

508S.Summt St., Weimar, Texas

Contactar ahora

Especificaciones del producto

  • Brand Name: zinc, metals, aluminum, cupper, iron, gold, stainless steel
  • Type: Zinc Strip

Descripción del producto

A variant of strip galvanizing is the so-called zinc alloy hot dip, in which zinc alloy coatings are applied to the steel strip. These consist of zinc aluminum (ZA), zinc magnesium (ZM) or zinc aluminum magnesium (ZAM). The usual layer thickness of these coatings is up to *5 microns. THE process sequence in hot dip coating with zinc alloys largely corresponds to hot dip coating with zinc and is described in " Galvanizing strips (pure zinc coatings) ". Also with zinc alloys, melt-refined steel strip is a so-called semi-finished product, which is a precursor, which is further processed by galvanizing by stamping, stamping and cutting. As a result, the protective layer of zinc is destroyed at the cutting and punching edges.


 

País: USA
N º de Modelo: -
Precio FOB: 300 ~ 490 / Metric Ton Obtener el precio más reciente
Lugar de origen: USA
Precio de pedido mínimo: 300 per Metric Ton
Cantidad de pedido mínimo: 100 Metric Ton
Detalle de embalaje: in containers
El tiempo de entrega: 27 days
Capacidad de suministro: 500 Metric Ton per Week
Tipo de pago: T/T
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Mr. Gary Michael < GT LLC >

quiero saber: