Precio FOB
Obtener el precio más reciente35 / Square Meter
|300 Square Meter Minimum Order
País:
China
N º de Modelo:
YL65440
Precio FOB:
35 / Square Meter Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
35 per Square Meter
Cantidad de pedido mínimo:
300 Square Meter
Detalle de embalaje:
Load in to 40ft GP, 20ft GP or 40HQ or 40 OT
El tiempo de entrega:
25-35 days
Capacidad de suministro:
1200 Ton per Month
Tipo de pago:
L/C, T/T
Grupo de productos :
-
Persona de contacto Liu
Qingdao, Shandong
1. Steel Structure Parts (Q**5B and Q**5B) (1). Steel Column: H Section Steel (2). Steel Beam: H Section Steel (3). Withstand Wind Column: H Section Steel (4). Connected beam: Circular Tube (5). Roof Purline: C Section Steel or Z Section Steel (6). Wall purline: C Section Steel or Z Section Steel (7). End Wall purline Section Steel or Z Section Steel
2. Panel Material parts (1). External Wall panel: (below is selectable) *1. *0mm, *5mm or **0mm thickness EPS sandwich panel *2. *0mm, *5mm or **0mm thickness Rockwool sandwich panel *3. **0# 0.**6mm or 0.5mm Corrugated Galvanized Steel sheet with different Color (2). Internal Wall panel: (below is selectable) *1. *0mm, *5mm or **0mm thickness EPS sandwich panel *2. *0mm, *5mm or **0mm thickness Rockwool sandwich panel (3). Roofing panel: (below is selectable) *1. *0mm, *5mm or **0mm thickness EPS sandwich panel *2. *0mm, *5mm or **0mm thickness Rockwool sandwich panel *3. **0# 0.**6mm or 0.5mm Corrugated Galvanized Steel sheet with different Color (4). Skylight: **0 Glass Fiber Reinforced Plastics (FRP)
3. Door and Window parts (1). External Door *1. Over-heat Orbit Sliding Door with double open *2. Galvanized steel opening by power-operated Roller Door (2). Internal Door: *0mm Thickness EPS sandwich panel with aluminum alloy door frame (3). Window: UPVC Widow or aluminum alloy window frame with glass.
4. Drainage parts (1).Galvanized water channel: 2mm thickness galvanized steel water channel : ***0mm or ***0mm/pcs (2). Down spout: ***5;**0 PVC Down spout with Accessories
5. Connecting Piece parts (1) Purline draw bar: ***5;*2 (2) Horizontal Bracing: ***5;*4 Circular Tube (3) Knee-Bracing: L Steel (4) Purline Drive pipe: Φ*2*2 (5) Column Bracing: ***5;*4 Circular Tube
|
Yili projects in other countries
Our technology process
YILI COMPANY
QingdaoYili Steel Structure&EngineeringCo.,Ltd adopts the light steel structure and we follow the relevant domestic norms and regulations. And we design them by using advanced computer-aided design software .
We manufacture and process them by using the advanced domestic equipment with great care. Thus we ensure the optimization and perfection of the building systems and construction quality fundamentally.
if you are not familiar with the detail of products,please reffer to this
photo and give us your questions and reqirements
we need you supply the answers of questions as following
1.Data for design
*Live load on roof(KN/M2)
*Wind speed(KM/H)
*Snow load (KG/M2)
*Rain load
(KG/M2)
*Earthquake load if have
*Demands for
doors and windows
*Crane (if have) ,Crane span, crane
lift height, max lift capacity, max wheel pressure and min wheel
pressure!
2.material quality
*Windows and doors quantity,size and location
*Roof and wall material ,sandwich panel or corrugated steel sheet
*Purlin type C or Z
3.Type
*size*-width,length,eave height and roof slope
*single slope or double slope
*single span or double span
* single floor,double floor or multi floor
PACKING DETAILS
Load in to *0ft GP, *0ft GP or *0HQ or
*0 OT
1. Aluminum frame packed in membrane
film;
2. Steel component: packed in wooden
pallet;
3. Roof and sidewall fabric: packed in PVC carry
bag.
País: | China |
N º de Modelo: | YL65440 |
Precio FOB: | 35 / Square Meter Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 35 per Square Meter |
Cantidad de pedido mínimo: | 300 Square Meter |
Detalle de embalaje: | Load in to 40ft GP, 20ft GP or 40HQ or 40 OT |
El tiempo de entrega: | 25-35 days |
Capacidad de suministro: | 1200 Ton per Month |
Tipo de pago: | L/C, T/T |
Grupo de productos : | - |