Precio FOB
Obtener el precio más reciente|
- Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
-
Detalle de embalaje:
-
El tiempo de entrega:
-
Capacidad de suministro:
-
Tipo de pago:
-
Grupo de productos :
-
Persona de contacto pinglemachine
Shijiazhuang, Hebei
1. Structure
a. This *-storey plant has a compact structure, and it needs only a
small number of operators, usually **3 men fewer. The operators
could get a clear view upwards when standing on the bottom, such as
the running status of purifier, mill, air lock, centrifugal fan,
square plansifter, etc.
b. Compared with multi-storey type, this steel structure Wheat
Milling Equipment could be put into use 4 months earlier due to the
shortened building time. Hence, the investment will be returned
much faster.
c. It takes a short time to finish installation and pilot run. For
example, the installation time for the **0TPD is only *0 days.
d. Due to the limited building height, the construction cost is
only 1/2 or 1/3 of mulit-storey type.
2. Complete Product
a. The steel frame is manufactured from high quality steel that is
provided by Wuhan Iron and Steel (Group) Corp. The steel columns
and supporting parts are welded by 5mm steel tubes and square tubes
to offer high strength and good stability. The steel frame is
independently installed, and it is not connected to any
building.
País: | China |
N º de Modelo: | - |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | - |
Detalle de embalaje: | - |
El tiempo de entrega: | - |
Capacidad de suministro: | - |
Tipo de pago: | - |
Grupo de productos : | - |