Precio FOB
Obtener el precio más reciente900 ~ 1200 USD / Ton
|20 Ton Minimum Order
País:
China
N º de Modelo:
XGZ-5
Precio FOB:
900 ~ 1200 USD / Ton Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
900 per Ton
Cantidad de pedido mínimo:
20 Ton
Detalle de embalaje:
in bulk or 40ft HQ and 40ft OT
El tiempo de entrega:
within 30-45 days after deposit received
Capacidad de suministro:
2000 Ton per Month
Tipo de pago:
L/C, T/T
Grupo de productos :
Persona de contacto Ms. Ann
268 Sancheng Rd,Pingdu, Qingdao, Shandong
Steel structure aircraft hangar
Project time: ***9, hangar is used as the plane repair house,
place of steel hagar is Australia, which
covers an area of ***8 M2
Steel structure aircraft hangar description:
1. Main steel structureof the steel
hangar is made in welded H steel
2. Column and beam of steel hangars: Q**5, Q**5 welding H section
steel
3. Beam: Q**5, Q**5 welding H section steel
4. Roof panel: color steel sheet with foil insulation;
5. Wall of hangar adopts Glass wool sangwich paneland thickness
is **0mm ,Both side steel panel thickness is 0.5mm white-gery
color
6. Knee brace: Q**5 angle steel
7. Vertical and transversal support: Q**5 angle steel, round bar
or steel pipe
8. Tie bar: Q**5 steel pipe
9. Brace: Q**5 round bar
*0. Sleeve: Q**5 steel pipe
*1. Cladding system: sandwich panels (EPS, PU, Fiber glass wool
etc.) or can use corrugated steel sheet with fiber glass wool
insulation and steel wire gauze
*2.Skylight sheet
*3. Door: sandwich panel sliding door
*4. Windows: Aluminum or PVC
Characteristics of steel hangar
1.Light steel structure with color sheet or sandwich panel
2. Resisting heavy wind of **0km/h and 7 grade earthquake
3. Fire proof and heat insulation performance.
4. Steel hangar is easy to assemble
5. The components can be reused when over *0 years
6. The waterproof on the roof makes the hangar a good sealing
effect
7. A concrete square can meat the requirement of the foundation
País: | China |
N º de Modelo: | XGZ-5 |
Precio FOB: | 900 ~ 1200 / Ton Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 900 per Ton |
Cantidad de pedido mínimo: | 20 Ton |
Detalle de embalaje: | in bulk or 40ft HQ and 40ft OT |
El tiempo de entrega: | within 30-45 days after deposit received |
Capacidad de suministro: | 2000 Ton per Month |
Tipo de pago: | L/C, T/T |
Grupo de productos : | Steel Structure Hangar |