¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Steam turbine parts diaphgram
Next

Steam turbine parts diaphgram

( Negotiable )

|

1 Piece Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

( Negotiable ) Obtener el precio más reciente

Lugar de origen:

Hebei, China (Mainland)

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

1 Piece

Detalle de embalaje:

Wooden/steel packages are suitable for International Mulit-transportation

El tiempo de entrega:

Nomarlly 1-3 months according to customers' r

Capacidad de suministro:

2000 Ton per Year

Tipo de pago:

-

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Hannah

Tianshan Technology Industrial Park, No.319, Xiangjiang Road, Shijiazhuang, Hebei

Contactar ahora

Especificaciones del producto

  • Sizes:According to your requirement
  • Place of Origin:Hebei, China(mainland)
  • Materials:Alloy Steel, High-Temperature Stainless Steels, High-Tempera
  • Maximum temperature:1100 degrees
  • Strength grade range:205Mpa-1035Mpa

Descripción del producto

GYEP(Hebei Guoyuan Electric POwer Equipment Co.,Ltd)manufacture various types of diaphragms depending on customer needs. We specialize in on time delivery of all the steam turbine parts.
The brief introduction of GYEP diaphragm for steam turbine comprises:
1. Scope of application: 7MW****0MW steam turbine diaphragms, diaphragm of cascade type and direct welding type.
2. Professional advantages: Excellent welding operator and welding equipment, rich experience in welding and heat treatment, complete machining equipments.
Seven-Shafts Robot Automatic Rotary Welding:
Narrow gap welding quality zero defect
Circular automatic rotation
Automatic heat preservation during welding process, effective control of welding temperature
Whole process automatic welding without intermission

Production advantages:
1. Quality assurance: Ensures that all products would be inspected totally, including
chemical composition, mechanical property, hardness, UT, MT, PT, grain size and geometric dimensioning inspections. Inspectors all own ISO***2/EN**3 and GB operation certificate.
2. Production traceability: All the links in the production chain, such as materials incoming inspection, heat treatment, product processing and finished testing, are traceable to ensure products **0% qualified.
3. GYEP successfully passed ISO***1, ISO****1, and OHSAS****1 management system certification in quality, environment and health from ***0 to now. GYEP operationers all own ISO***2/EN**3 operation certificate of UT, MT, PT .

We are original manufacturer for all kinds of connetion parts, so we can provide you with the very same spare parts of steam turbine as the original manufacturer can do.

Special bolt, nut, stud, screw of HP/IP/LP inner & outer casing, diaphragm, valve parts, structual parts, etc.
Bolt, nut, screw of auxiliaries equipments
Coupling bolts and nuts of turbine and generator rotor
Material heat treatment
Steam turbine repair service
power plant overhaul

País: China
N º de Modelo: -
Precio FOB: ( Negotiable ) Obtener el precio más reciente
Lugar de origen: Hebei, China (Mainland)
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 1 Piece
Detalle de embalaje: Wooden/steel packages are suitable for International Mulit-transportation
El tiempo de entrega: Nomarlly 1-3 months according to customers' r
Capacidad de suministro: 2000 Ton per Year
Tipo de pago: -
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Hannah < Hebei Guoyuan Electric Power Equipment Co., Ltd >

quiero saber: