Precio FOB
Obtener el precio más reciente|
50000 Metric Ton Minimum Order
País:
Singapore
N º de Modelo:
-
Precio FOB:
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
50000 Metric Ton
Detalle de embalaje:
Bulk
El tiempo de entrega:
30 days
Capacidad de suministro:
200000 Metric Ton per Month
Tipo de pago:
L/C
Grupo de productos :
-
Singapore
Persona de contacto Mr. WJ
Singapore, Singapore, Other
Indonesia steam coal
NCV ****- USD *7/ MT CFR south china port
NCV. ****- USD *7/ MT CFR a south china port
trial *0,**0mt follow by **0,**0mt x *2 months
*8*2 DLC
2% PB
Items for Qualityè´¨é‡é¡¹ç›®
Guaranteed Specifications
ä¿è¯å€¼
Rejection拒收值
NET CALORIFIC VALUE (ARB)
低ä½çƒå€¼ï¼ˆæ”¶åˆ°åŸºï¼‰
***0Kcal/Kg
<***0kcal/kg
TOTAL MOISTURE (ARB)
全水(收到基)
*4 %max
>*6%
INHERENT MOISTURE (ADB)
内水(空干基)
*4 %max
ASH CONTENT (ADB)
ç°åˆ†ï¼ˆç©ºå¹²åŸºï¼‰
*2 %max
>*6 %
VOLATILE MATTER (ADB)
挥å‘份(空干基)
*9%**3%
FIXED CARBON (ADB)
固定碳(空干基)
By difference
TOTAL SULPHUR (ADB)
全硫(空干基)
1 %max
>1.0%
HARDGROVE INDEX (HGI)
哈æ°å¯ç£¨æŒ‡æ•°
*5–*5
SIZE 粒度
***0mm (*0%)
CLAUSE 6: PRICE ADJUSTMENT - BONUS AND PENALTY
第å…æ¡ï¼šä»·æ ¼è°ƒæ•´–奖励åŠå¤„罚
The price of Coal shall be adjusted according to the following
calculation of bonus and penalty :( Based on SGS Indonesia for *8%
at Loading port and SGS China on 2% at unloading port. If SGS is
not available at that unloading port CCIC China shall be used.)
None other than SGS or CCIC are accepted. SGS China result will be
binding for the final 2% commercial invoice calculation.
ç…¤ç‚çš„ä»·æ ¼æ ¹æ®ä»¥ä¸‹å¥–罚措施进行调整:(装è¿æ¸¯åŸºäºŽSGSå°å°¼ä»˜æ¬¾*8%,å¸è´§æ¸¯åŸºäºŽSGSä¸å›½ä»˜æ¬¾2%)
• Net Calorific Value(ARB)
低ä½çƒå€¼ï¼ˆæ”¶åˆ°åŸºï¼‰
This Unit Price of the goods is based on
Contractual specification Net Calorific Value ***0Kcal/kg
(ARB).
货物å•ä»·æ˜¯å»ºç«‹åœ¨åˆåŒä½Žä½å‘çƒé‡***0大å¡/åƒå…‹(收到基)
的基础上。
6.1.1 If the actual net calorific value is lower than NCV
***0Kcal/kg (ARB), the Buyer has the right to reject the cargo. If
the Buyer chooses to accept the cargo with net calorific value
lower than NCV***0Kcal/kg (ARB), the unit price shall be deducted
by USD0.*4/MT for every Kcal/kg, but the Buyer shall not accept
cargo if the actual net calorific value is lower than NCV
***0Kcal/kg (ARB).
如è¯å®žä½Žä½çƒé‡ä½ŽäºŽNCV
***0大å¡/åƒå…‹ï¼ˆæ”¶åˆ°åŸºï¼‰ï¼Œä¹°æ–¹æœ‰æƒæ‹’收货物。如果买方åŒæ„接å—低ä½å‘çƒé‡ä½ŽäºŽNCV
***0大å¡/åƒå…‹(收到基)的这船货物,则æ¯å¤§å¡éœ€æ‰£å‡æ¯å…¬å¨0.*4美元,但买方ä¸æŽ¥å—实际低ä½çƒå€¼ä½ŽäºŽNCV
***0(收到基)的货物。
6.1.2 If the actual net calorific value is lower than NCV
***0Kcal/kg (ARB) but higher than NCV ***0Kcal/kg (ARB), the unit
price shall be deducted by USD0.***3/MT for every Kcal/kg.
如果实际低ä½çƒé‡ä½ŽäºŽNCV
***0大å¡/åƒå…‹ï¼ˆæ”¶åˆ°åŸºï¼‰ä½†æ˜¯é«˜äºŽNCV
***0大å¡/åƒå…‹ï¼ˆæ”¶åˆ°åŸºï¼‰ï¼Œåˆ™æ¯å¤§å¡é¡»æ‰£å‡è´§ä»·æ¯å…¬å¨0.***3美元。
6.1.3 If the Actual Net Calorific Value is higher than NCV
***0Kcal/kg (ARB) but lower than NCV ***0Kcal/kg (ARB), the Unit
Price shall be added by USD0.***3/MT for every Kcal/kg difference
on a pro rata basis as bonus price.
如果实际低ä½å‘çƒé‡é«˜äºŽ***0大å¡/åƒå…‹ï¼ˆæ”¶åˆ°åŸºï¼‰ä½†æ˜¯ä½ŽäºŽ***0大å¡/åƒå…‹ï¼ˆæ”¶åˆ°åŸºï¼‰ï¼Œæ¯å¤§å¡å¢žåŠ æ¯å…¬å¨0.***3美元作为奖励。
6.1.4 If the actual net calorific value is higher than NCV
***0Kcal/kg(ARB), the Unit Price shall be based on net calorific
value NCV ***0Kcal/kg(ARB).
如果实际低ä½å‘çƒé‡é«˜äºŽNCV
***0大å¡/åƒå…‹ï¼ˆæ”¶åˆ°åŸºï¼‰ï¼Œåˆ™ä»¥å®žé™…低ä½å‘çƒé‡NCV
***0大å¡/åƒå…‹ï¼ˆæ”¶åˆ°åŸºï¼‰ä¸ºåŸºå‡†è®¡ç®—å•ä»·ã€‚
6.2​TOTAL SULPHUR(ADB) 全硫(空干基)
If the TOTAL SULPHUR (ADB) exceeds 1.0%, Buyer has the right to
refuse the cargo and Seller shall be regarded as the party
breaching this Contract.
若全硫(空干基)高于1.0%,则买方有æƒæ‹’收货物,å–方应被视为è¿çº¦ä¸€æ–¹ã€‚
6.3 Total Moisture (ARB) 全水(收到基)
6.3.1 In the event the actual Total Moisture (ARB)
showed on SGS Quality Certificate is more than *4%, the exceeding
portion shall be deducted from the total tonnage. The calculation
formula is as follow:
当SGSè´¨é‡æŠ¥å‘Šä¸Šçš„ç…¤ç‚收到基全水分å«é‡é«˜äºŽ*4%时,超过的部分应从总å¨æ•°ä¸æ‰£é™¤ï¼Œè®¡ç®—å…¬å¼å¦‚下:
Invoice Weight = [**0% - (Actual TM – *4%)] x Weight showed on SGS
Weight Certificate
å‘票é‡é‡ = [**0% - (实际全水分å«é‡–*4%)] x SGS
é‡é‡æŠ¥å‘Šä¸Šçš„é‡é‡
6.3.2 When the actual Total Moisture (ARB) exceeds
*6%, under the condition that the coal shall be at usable
condition, Seller and Buyer shall negotiate in good faith to agree
an equitable settlement for such shipment. Buyer shall have the
right to apply double the penalty value or settle at a new price to
solve the problem.
一旦全水分(收到基)å«é‡é«˜äºŽ*6%时,煤ç‚在买方å¯ç”¨çš„å‰æ下,å–方和买方应基于善æ„原则,å商一致采å–å…¬æ£çš„措施处ç†è¯¥æ‰¹è´§ç‰©ã€‚买方有æƒé‡‡ç”¨åŠ å€ç½šæ¬¾æˆ–å•†è®¨ä¸€ä¸ªæ–°çš„ä»·æ ¼çš„æ–¹å¼ä»¥åœ†æ»¡è§£å†³é—®é¢˜ã€‚
6.4 ASH CONTENT (ADB) 空干基ç°åˆ†
6.4.1 In the event the actual Ash content (ADB) showed
on SGS Quality Certificate exceeds *2% , then the base price per
tonne shall be reduced at the rate of USD 0.3 per tonne for every
1% of Ash contents exceeds *2% fraction pro-rata till the rejection
limit of *4%. For calculation, the decimal shall be counted only
two decimal points without rounding up.
​当SGSè´¨é‡è¯ä¹¦ä¸Šçš„实际ç°ä»½ï¼ˆç©ºå¹²åŸºï¼‰é«˜äºŽ*2%时,æ¯å…¬å¨ç…¤ç‚ä»·æ ¼å°†æŒ‰ç°ä»½æ¯é«˜äºŽ1%è°ƒé™0.3美元,直到(空干基)*4%为æ¢ã€‚计算时,将åªè®¡ä¸¤ä½å°æ•°è€Œä¸å†å››èˆäº”入。
6.4.2 In the event the actual Ash content (ADB) of Coal
is higher than *4%, under the condition that the coal shall be at
usable condition, Seller and Buyer shall negotiate in good faith to
agree an equitable settlement for such shipment. Buyer shall have
the right to apply double the penalty value or settle at a new
price to solve the problem.
当煤ç‚的实际ç°ä»½ï¼ˆç©ºå¹²åŸºï¼‰é«˜äºŽ*4%时,煤ç‚在买方å¯ç”¨çš„å‰æ下,å–方和买方应基于善æ„原则,å商一致采å–å…¬æ£çš„措施处ç†è¯¥æ‰¹è´§ç‰©ã€‚买方有æƒé‡‡ç”¨åŠ å€ç½šæ¬¾æˆ–å•†è®¨ä¸€ä¸ªæ–°çš„ä»·æ ¼çš„æ–¹å¼ä»¥åœ†æ»¡è§£å†³é—®é¢˜ã€‚
6.5​If the Buyer rejects any of the coal shipment within this
Contract, Seller and Buyer shall sincerely agree to double the
penalty or reconfirm a new price in order to satisfactorily solve
the rejection problem, provided that the coal is usable.
如买方拒收本åˆåŒé¡¹ä¸‹ä»»æ„一船煤,å–方和买方应真诚å商,在煤ç‚å¯ç”¨çš„å‰æä¸‹ï¼Œé‡‡ç”¨åŠ å€ç½šæ¬¾æˆ–å•†è®¨ä¸€ä¸ªæ–°çš„ä»·æ ¼ï¼Œä»¥åœ†æ»¡è§£å†³æ‹’æ”¶é—®é¢˜ã€‚
CLAUSE 7: PAYMENT
第七æ¡ï¼šä»˜æ¬¾
7.1​ Payment Term付款方å¼Irrevocable Non Transferable LC at
sight with *8% at loading port SGS Indonesia + 2% on SGS China
a. The payment term is L/C at sight. The following procedures shall
apply in the following
order:付款æ¡ä»¶æ˜¯å³æœŸä¿¡ç”¨è¯ï¼Œæµç¨‹å¦‚下:
• Within three (3) working days after the Original signed and
stamped Contract, Buyer should provide letter of credit application
for approval by Seller and Seller’s bank. Letter of application
shall with buyer’s bank original endorsement.
在æ£æœ¬åˆåŒç¾ç½²åŽä¸‰ä¸ªå·¥ä½œæ—¥å†…,买方应æ供信用è¯å¼€è¯ç”³è¯·ä¹¦ç»™å–方和å–方银行确认。申请书应有买方银行的确认ç¾ç« 。
• Within two (2) working days after Confirmation on the application
of letter of credit from seller and buyer accept it ,
Seller’s bank issues Non-Operative Performance Bond, in favor of
the Buyer or Buyer’s nominee, for 2% of the value of the first
trial shipment. Within 5 working days after receive seller’s
Non-Operative Performance Bond, The buyer shall issue operative LC
to activate the PB. The LC contents must be same as the confirmed
application of LC approved by seller and the copy of confirmed
application of LC will be attached with the performance bond as the
part of condition to negotiate the performance bond by buyer. The
PB shall be valid for two (2) months from the issuing date.
在收到信用è¯å¼€è¯ç”³è¯·ä¹¦åŽ2个工作日内,买方银行开出相当于试航次货值的2%的以买方或其指定人为å—益人的未生效的履约ä¿å‡½ã€‚在收到å–方未生效的履约ä¿å‡½åŽçš„5个工作日内,买方应开具生效的信用è¯æ¥æ¿€æ´»è¯¥å±¥çº¦ä¿å‡½ã€‚ä¿å‡½è‡ªå¼€å‡ºæ—¥èµ·2个月有效。
• After receipt of the letter of credit DRAFT WIRED from the
Buyer’s bank, Buyer may have the right to visit the mining site,
stockpile, jetty and take samples by himself. The Seller should
cooperate to the arrangement as requested by the
Buyer.在å–方收到信用è¯å¼€è¯ç”³è¯·ä¹¦åŽï¼Œä¹°æ–¹æœ‰æƒè€ƒå¯ŸçŸ¿å±±ï¼Œå †åœºï¼Œç 头和自行å–æ ·ã€‚å–方应予以é…åˆã€‚
• Within Three (3) working days after the visit and buyer’s
confirmation, Seller shall open Non Operative PB, the Buyer shall
establish through a prime bank acceptable to and in favor of the
Seller, an Irrevocable Letter of Credit, at sight for One Hundred
Percent (**0 PCT) of net invoice value including a plus/minus *0%
tolerance of quantity and total cargo value.
在考察åŽ3个工作日内,买方应通过第一级银行开具以å–方为å—益人的**0%ä¸å¯æ’¤é”€å³æœŸä¿¡ç”¨è¯ç»™å–方,包括é‡é‡å’Œæ€»è´§å€¼çš„*0%增å‡ã€‚
(v) If the Seller fails to
arrange the shipment of the goods under this Contract within Thirty
(*0) days after receipt of the Operative L/C issued by the Buyer’s
bank. The Buyer reserves the right to expropriate the Performance
Bond and terminate the Contract. In this case, the Seller shall,
within Two (2) banking days after the receipt of Buyer’s request of
L/C cancellation, inform the Seller’s bank to send the Buyer’s bank
a swift letter agreeing to cancel the L/C to assure the L/C
cancellation.
如果å–方在收到买方银行开立的信用è¯ä¹‹æ—¥èµ·*0天内未安排装船,则买方有æƒæ²¡æ”¶å–方开出的履约ä¿å‡½çš„金é¢ï¼ŒåŒæ—¶ä¹°æ–¹æœ‰æƒç»ˆæ¢åˆåŒã€‚在æ¤æƒ…况下,å–方须在收到买方撤销信用è¯è¦æ±‚åŽ2个银行日内通知å–方银行å‘电文åŒæ„撤销信用è¯ï¼Œä¿è¯ä¿¡ç”¨è¯çš„撤销。
(b)​The L/C should be valid for sixty (*0) days from the L/C
issuing date.
信用è¯ä»Žå¼€è¯ä¹‹æ—¥èµ·*0天内有效。
(c)​The L/C shall incorporate the following:
信用è¯åº”包å«ä»¥ä¸‹æ¡æ¬¾ï¼š
(i) Partial shipment is not allowed. Each shipment is *0,**0 tonnes
*0% more or less.
​​ (ii) Trans-shipment is not allowed.
(iii) Tolerance in value and quantity up to *0% plus or minus is
allowed.
(iv) The LC is
subject to UCP **0 latest version.
(v) Third
party documents are acceptable except commercial invoice and draft
bill of exchange.
• ä¸å…许分批装è¿ï¼›æ¯èˆ¹ä¸º4万娱*0%。
​(ii)ä¸å…许转船è¿è¾“。
(iii) 货值和é‡é‡æœ€å¤šå…许*0%增å‡ã€‚
(iv)
信用è¯æ ¹æ®UCP**0最新版本。
(v)
除商业å‘票和汇票外的第三方å•è¯å¯æŽ¥å—。
(d) The text of the Performance Guarantee shall be
subject to the uniform rules for demand guarantees, ICC
publication No.**8,***0.
履约ä¿å‡½çš„æ–‡æœ¬æ ¹æ®ICC 出版**8
å·***0è§ç´¢å³é™„ä¿å‡½ç»Ÿä¸€è§„则。
País: | Singapore |
N º de Modelo: | - |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 50000 Metric Ton |
Detalle de embalaje: | Bulk |
El tiempo de entrega: | 30 days |
Capacidad de suministro: | 200000 Metric Ton per Month |
Tipo de pago: | L/C |
Grupo de productos : | - |