Precio FOB
Obtener el precio más reciente|
1 Ton Minimum Order
País:
China
N º de Modelo:
AG-8-2
Precio FOB:
Lugar de origen:
China
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Ton
Detalle de embalaje:
-
El tiempo de entrega:
With in 20 days after received the T/T deposit
Capacidad de suministro:
100 Ton per Week
Tipo de pago:
L/C, T/T
Grupo de productos :
-
Persona de contacto Ms. Passion
Room 19, building 4-7 of zhong mao apartment, dongfanghong road south,dezhou economic development Zo, Other, Hebei
INTERNATIONAL ALLOY BRAND NO.REFERENCE | |||||||
Catagory | GB | ISO | ASTM | JIS | BS | DIN | EN |
Copper tube | TU2 | Cu-OF | C****0 | C***1 | C**1 | OF-Cu | CW**8A |
T2 | Cu-FRHC | C****0 | C***0 | C**1 | E-Cu*8 | ||
TP2 | Cu-DHP | C****0 | C***0 | C**6 | SF-Cu | CW**4A | |
TP1 | Cu-DLP | C****0 | C***1 | SW-Cu | CW**3A | ||
Brass tube | H*0 | CuZn*0 | C****0 | C***0 | CZ**1 | CuZn*0 | CW**1L |
H*0 | CuZn*0 | C****0 | C***0 | CZ**6 | CuZn*0 | CW**5L | |
H*8 | C****0 | C***0 | CuZn*3 | CW**6L | |||
H*5 | CuZn*5 | C****0 | C***0 | CZ**7 | CuZn*6 | CW**7L | |
H*3 | CuZn*7 | C****0 | C***0 | CZ**8 | CuZn*7 | CW**8L | |
H*2 | CuZn*0 | C****0 | C***0 | CZ**9 | CW**9L |
País: | China |
N º de Modelo: | AG-8-2 |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Ton |
Detalle de embalaje: | - |
El tiempo de entrega: | With in 20 days after received the T/T deposit |
Capacidad de suministro: | 100 Ton per Week |
Tipo de pago: | L/C, T/T |
Grupo de productos : | - |