Precio FOB
Obtener el precio más reciente6000 ~ 10000 USD / Set
|1 Set Minimum Order
País:
China
N º de Modelo:
TY-200B
Precio FOB:
6000 ~ 10000 USD / Set Obtener el precio más reciente
Lugar de origen:
CHINA
Precio de pedido mínimo:
6000 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
polyfoam and cardboards, proper packing suitable for container loading for each accessories
El tiempo de entrega:
within 15 days after the delivery of deposit
Capacidad de suministro:
80 Set per Month
Tipo de pago:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other
Grupo de productos :
-
Persona de contacto Mr. James
Huangshan 5 road, Binzhou, Shandong
Specification | ||||||||
Outside Size:(mm) | ***0(L)****0(W)****0(H) | Front Door:(mm) | ***0(W)****0(H) | |||||
Inside  Size:(mm) | ***0(L)****0(W)****0(H) | Total Power:(kw) | *5;**0V/3phase/*0Hz | |||||
Cabin System | Wallboard | EPS colorful(gray,blue and red) steel skin panel,*0mm thick,steel 0.4mm thick,tongue&groove style,anti-flame and                 heat-insulation, galvanized steel roof panel. | ||||||
Front Door | *-fold main doors,***0****0mm(W×H),with safety glass windows,    aluminum alloy frame, handle and lock. | |||||||
Escape Door | 1 unit **0****0mm(W×H), with safety glass windows,                       aluminum alloy frame,handle and high-pressure safty lock. | |||||||
Basement |  **0mm height metal-base.Galvanized steel sheet and square steel pipe assembling,2 rows of grid plates made by flat bar and round steel,  3 rows of embossed plates, galvanized.                      Two sets of galvanized ramps. | |||||||
Air Circulation system |                             Intake Fan | Two sets of 4KW centrifugal fan | Exhaust Fan | One set of 5.5KW professional fan | ||||
Cabinet for the fans*1unit,Air Ducts*3pcs,Electric Damper*1unit | ||||||||
Filtering system | Pre-filter*1set,filtering rate>*3%, Italy SF **0G high efficiency filter(ceiling filter) filtering rate>*7%,    floor filter(fiberglass filter) filtering>*0%,activated carbon filter. Full galvanized grilled. | |||||||
Heating System | Italy Riello G*0 Diesel Burner.Stainless steel heat exchanger,argon arc welding.                         5~*0 minutes reaching the baking temperature *0°c~*0°c.                                                               1 unit of cabinet(rock wool insulation) for the burner&heat exchanger;                               2 pcs of air ducts | |||||||
Lighting system | Ceiling Lights: 8Units×4Pcs=*2Pcs×*0W, with electronic ballasts,power-coated light box. Side Lights: 8Units×2Pcs=*6Pcs×*0W, with electronic ballasts,                   horizontally set,power-coated light box. | |||||||
Controlling system | Micro-computer programmed controlling,Power switch,spray/baking switch,               light switch,emergency stop,breakdown alarm. | |||||||
Note | Any size! Any Structure! All possible! |
País: | China |
N º de Modelo: | TY-200B |
Precio FOB: | 6000 ~ 10000 / Set Obtener el precio más reciente |
Lugar de origen: | CHINA |
Precio de pedido mínimo: | 6000 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | polyfoam and cardboards, proper packing suitable for container loading for each accessories |
El tiempo de entrega: | within 15 days after the delivery of deposit |
Capacidad de suministro: | 80 Set per Month |
Tipo de pago: | T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other |
Grupo de productos : | - |