¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Spiral Welded Pipe
Next

Spiral Welded Pipe

10 ~ 500 USD / Ton

|

10 Ton Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

10 ~ 500 USD / Ton Obtener el precio más reciente

Lugar de origen:

China

Precio de pedido mínimo:

10 per Ton

Cantidad de pedido mínimo:

10 Ton

Detalle de embalaje:

box, container.etc

El tiempo de entrega:

15to20days

Capacidad de suministro:

100000000 Ton per Week

Tipo de pago:

PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Ms. Sijia

3846 Yanshan County, Cangzhou, Hebei, China, Cangzhou, Hebei

Contactar ahora

Especificaciones del producto

  • Standard: ISO

Descripción del producto

Standard: API 5L, API 5CT, ASTM A**2, ASTM *3,

EN****7, EN****9, BS ***0, ASTM A**2 , JIS, IS,

Certificate: EN****7, EN****9, API 5L PSL1/ PSL2, API 5CT

Out Diameter: **9.1 - ***8mm

Wall Thickness: 5 - *0mm

Wall Thickness 3mm**0mm

Length: Up to *0m

Steel Grade: API 5L: GR A, GR B,

X*2,X*6, X*6, X*0,X*5,X*0

ASTM A**2 GR 1, GR 2, GR 3

ASTM A*3: GR A, GR B, GR C, GR D

BS ***0: Grade *3, Grade *0

EN: S**5, S**5JR, S**5JRH, S**5J2H



















































 

Standard: API 5L, API 5CT, ASTM A**2, ASTM *3, EN****7, EN****9, BS ***0, ASTM A**2 , JIS, IS, 
Certificate: EN****7, EN****9, API 5L PSL1/ PSL2, API 5CT 
Out Diameter: **9.1 - ***8mm
Wall Thickness: 5 - *0mm
Length: Up to *0m
Steel Grade:  API 5L: GR A, GR B, X*2,X*6, X*6, X*0,X*5,X*0
ASTM A**2 GR 1, GR 2, GR 3
ASTM A*3: GR A, GR B, GR C, GR D
BS ***0: Grade *3, Grade *0
EN: S**5, S**5JR, S**5JRH, S**5J2H
Surface Treatment: Fusion bond Epoxy coating, Coal Tar Epoxy, 3PE, Vanish Coating, Bitumen Coating, Black Oil coating as per customers requirement 
Test: Chemical Component Analysis, Mechanical Properties (Ultimate tensile strength, Yield strength, Elongation), Technical Properties (Flattening Test, Bending Test, Blow Test, Impact Test), Exterior Size Inspection, Hydrostatic Test, X-ray Test.
Mill Test Certificate:  EN ****4/3.1B 

 
 

Spiral seam submerged arc welded steel tube sy******3 is mainly used for conveying oil and natural gas pipelines.Spiral welded high frequency steel tube sy******3 for confined fluid transport, welded by high frequency lap welding method, spiral welded high frequency steel tube for confined fluid transport.The steel pipe has strong bearing capacity and good plasticity, which is convenient for welding and processing.Spiral seam arc-welded steel tube sy******3 is generally used for low-pressure fluid transportation. It is made by double-sided automatic submerged arc welding or single-side welding method and used for water, gas, air, steam and other general low-pressure fluid transportation.

 

 

 

The commonly used standards for spiral steel tubes are generally divided into :SY/ t********0 (ministry standard, also known as spiral seam submerged arc welded steel tubes for ordinary fluid conveying pipelines), GB/ t***1.*****7 (national standard, also known as technical delivery conditions for oil and gas industry conveying steel tubes part 1: a-grade steel tubes (GB/T***1.2 b-grade steel tubes with strict requirements), api*5l (American petroleum institute, also known as pipeline steel tubes);It is divided into PSL1 and PSL2 grades) and SY/ t******2 (spiral seam submerged arc welding steel pipe for pile).folding

 

 

 

 

 

the welding material should be baking and preservation in accordance with the following requirements: electrode, flux should be placed in ventilated, dry and at room temperature is not lower than 5 ℃ set up warehouses, establish special custody, baking and extend, and shall timely make a good record of the measured temperature and electrode.Baking temperature and baking time shall be strictly in accordance with the manufacturer's instructions.After baking electrode should be stored in a ******0 ℃ constant temperature box, coated should not fall off and obvious crack.The welding rod used on site shall be loaded into the insulation tube. The time of the electrode in the insulation tube shall not exceed 4h. After that, the electrode shall be baked again and the number of repeated baking shall not exceed 2 times.Remove rust and grease before using the welding wire.5, in case of drafts or wind velocity of over 8 m/s wind and rain, snow and temperature below 5 ℃, relative humidity above *0%, the welds should be reliable protection measures, to ensure that the welding place it needs enough temperature, welding skills is not affected, before welding.

 

 

País: China
N º de Modelo: -
Precio FOB: 10 ~ 500 / Ton Obtener el precio más reciente
Lugar de origen: China
Precio de pedido mínimo: 10 per Ton
Cantidad de pedido mínimo: 10 Ton
Detalle de embalaje: box, container.etc
El tiempo de entrega: 15to20days
Capacidad de suministro: 100000000 Ton per Week
Tipo de pago: PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Ms. Sijia < HongKeHua Pipeline Equipment Manufacturing Co., Ltd. >

quiero saber: