Precio FOB
Obtener el precio más reciente2600 ~ 2700 USD / ( Negotiable )
|1 Unit Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
2600 ~ 2700 USD / ( Negotiable )Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
2600
Cantidad de pedido mínimo:
1 Unit
Detalle de embalaje:
Standard Seaworthy Package
El tiempo de entrega:
Usually 7-15 days(Custom products are not include)
Capacidad de suministro:
-
Tipo de pago:
Other, PayPal
Grupo de productos :
-
Persona de contacto Yang Yanxia
Taocheng District, Hengshui City, Hengshui, Hebei
The hopper scoops up the material from the storage below, follows the conveyor belt or chain to the top, turns downward after bypassing the top wheel, and the bucket elevator dumps the material into the receiving trough. The drive belt of the bucket elevator with belt drive is usually rubber belt, which is installed on the drive drum below or above and the redirecting drum above and below. Chain-driven bucket elevators are generally equipped with two parallel drive chains, with a pair of drive sprockets above or below and a pair of redirecting sprockets below or above. Bucket elevators are generally equipped with a housing to prevent dust from flying in the bucket elevator.
País: | China |
N º de Modelo: | - |
Precio FOB: | 2600 ~ 2700 / ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 2600 |
Cantidad de pedido mínimo: | 1 Unit |
Detalle de embalaje: | Standard Seaworthy Package |
El tiempo de entrega: | Usually 7-15 days(Custom products are not include) |
Capacidad de suministro: | - |
Tipo de pago: | Other, PayPal |
Grupo de productos : | - |