Precio FOB
Obtener el precio más reciente12 ~ 8000 / Unit
|2 Unit Minimum Order
País:
China
N º de Modelo:
DN32-6000mm
Precio FOB:
12 ~ 8000 / Unit Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
12 per Unit
Cantidad de pedido mínimo:
2 Unit
Detalle de embalaje:
wooden case
El tiempo de entrega:
5days-30days
Capacidad de suministro:
10000 Unit per Month
Tipo de pago:
L/C
Grupo de productos :
-
Persona de contacto Ms. yali
yong an street, Zhengzhou, Henan
Make the flange right position to its corresponding mounting holes,
and get screws pass through the flange holes, then tighten the nut
with a wrench.
• Do not over the displacement limit of the single-ball
rubber joint during installation.
• Evenly mounting the bolts, gradually tighten the bolts to prevent
partial leakage.
• A flexible pressure pad shall be used for the working pressure
over 1.6MPa to prevent loose bolts during operation.
• Force supports are necessary at both ends of the vertical pipe
installation, use anti-pull-off devices to prevent pressure
pull-off.
• Keep away from heat/fire or ozone region, using non working media
or exposed to strong sunlights is strictly prohibited.
• Keep away from sharp materials during transport or storage.
País: | China |
N º de Modelo: | DN32-6000mm |
Precio FOB: | 12 ~ 8000 / Unit Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 12 per Unit |
Cantidad de pedido mínimo: | 2 Unit |
Detalle de embalaje: | wooden case |
El tiempo de entrega: | 5days-30days |
Capacidad de suministro: | 10000 Unit per Month |
Tipo de pago: | L/C |
Grupo de productos : | - |