Precio FOB
Obtener el precio más reciente28000 ~ 35000 / Set
|1 Set Minimum Order
País:
China
N º de Modelo:
GND369
Precio FOB:
28000 ~ 35000 / Set Obtener el precio más reciente
Lugar de origen:
Shanxi
Precio de pedido mínimo:
28000 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
Wooden case
El tiempo de entrega:
120 working days
Capacidad de suministro:
500 Set per Month
Tipo de pago:
T/T, L/C, D/A, D/P, Western Union, PayPal
Grupo de productos :
Persona de contacto winnie
Los Angeles, California
Electroplating wastewater include the pretreatment rinsing wastewater, plating rinsing wastewater. And the principal pollutants are heavy metal ion .
1.1 Up-to-standard discharge technology The emission of waste water which contains heavy metal ions such as Cr, Cu and Ni must meet the local requirements by adopting the means of Physical and Chemical Reaction + Sequencing Batch Precipitation + Ion Exchange + Compulsory Filtration to reach the standard.
1.2 Electroplating wastewater reuse technology Electroplating wastewater reuse technology means to add reclaimed water reuse system and reuse system on the basis of standardized discharge technology. The effluent can meet reclaimed water reuse standards(such as cleaning).
1.3 Electroplating wastewater zero-discharge technology MVR evaporator Working principle: MVR evaporator will increase the energy of secondary steam by using compressor, and will take advantage of the secondary steam with improved energy to recycle the potential heat of secondary steam. Specifically: Increase the pressure and temperature of the secondary steam generated by evaporator through the adiabatic compression in compressor, and after that, the steam will be fed into the heating chamber of evaporator (heat exchange system) as the heating steam, thus the potential heat of steam can be reused. The cold material will absorb the heat of non-condensable gas through preheating exchanger before being sent into evaporator, so the temperature of the cold material will increase, meanwhile, the condensate can be cooled by this material. This can further improve the utilization ratio of heat.
País: | China |
N º de Modelo: | GND369 |
Precio FOB: | 28000 ~ 35000 / Set Obtener el precio más reciente |
Lugar de origen: | Shanxi |
Precio de pedido mínimo: | 28000 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | Wooden case |
El tiempo de entrega: | 120 working days |
Capacidad de suministro: | 500 Set per Month |
Tipo de pago: | T/T, L/C, D/A, D/P, Western Union, PayPal |
Grupo de productos : | Environmental Protection Equipment |