¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
seal machine
Next

seal machine

|

- Minimum Order

País:

China

N º de Modelo:

php-009

Precio FOB:

Lugar de origen:

-

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

-

Detalle de embalaje:

-

El tiempo de entrega:

-

Capacidad de suministro:

-

Tipo de pago:

-

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Ms. linda

185#,299xiangjiang RD, suzhou, Jiangsu

Contactar ahora

Descripción del producto


Steel box seal machine   

                 

Reduction gears

If you use it in first time,*4 hours later, you need to change the lubricating oil and clean the machine. After that, please change the lubricating old every *******0hours

                   Power: **0V                                                                              

 

Must connect with the earth wire!!

 

 Lubricating oil

 ãˆ temperature more than 5°~*8°*0#lubricating oil

㈡less than 5°~0°,please use5# lubricating old

Preparation before than starting of the machine

㈠you need to add in the joints **4 times

㈡the plunger need to add the lubricating oil **6times

 

Adjustment

â‘ adjust the mould core

â‘¡adjust the space between upper &under shovel board and the mould core to about 1.5~2.5mm

â‘¢adjust the space between right &left shovel board and the mould core to about 0.5~mm

â‘£adjust the backer for putting the steel sheet to make sure it is in the middle. And make sure the two sides of the sheet are not too tight.

⑤check the right &left shovel board with the gate are well are not

â‘¥check the pressure head are pressing the tightly or not

⑦After the steel box are out, check whether the are flat in right and left. Adjust the screw are good or not

⑧If the pressure head are not in the middle of the gate, you can unscrew the 4 screws of the planker and then adjust it.

⑨Please pay attention to the cleaning of the joints and outside parts

 

        
 

País: China
N º de Modelo: php-009
Precio FOB: Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: -
Cantidad de pedido mínimo: -
Detalle de embalaje: -
El tiempo de entrega: -
Capacidad de suministro: -
Tipo de pago: -
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Ms. linda < Kunshan TC-force machine Co., Ltd >

quiero saber: