Precio FOB
Obtener el precio más reciente|
100 Piece Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
Lugar de origen:
China
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
100 Piece
Detalle de embalaje:
-
El tiempo de entrega:
7-30 days
Capacidad de suministro:
500 Piece per Day
Tipo de pago:
T/T, Western Union
Grupo de productos :
-
Persona de contacto Kairu
Liuhuang Road, Wenzhou, Zhejiang
Type |
SC-D*9 |
SC-D*2 |
SC-D*8 |
SC-D*5 |
SC-D*2 |
|
Rated working |
AC3 |
9 |
*2 |
*8 |
*5 |
*2 |
AC4 |
3.5 |
5 |
7.7 |
8.5 |
*2 |
|
AC3 capacity of phase 3
squirrelcage |
**0/**0V |
2.2 |
3 |
4 |
5.5 |
7.5 |
**0/**0V |
4 |
5.5 |
7.5 |
*1 |
*5 |
|
**5V |
4 |
5.5 |
9 |
*1 |
*5 |
|
**0V |
5.5 |
7.5 |
*0 |
*5 |
*8.5 |
|
**0/**0V |
5.5 |
7.5 |
*0 |
*5 |
*8.5 |
|
Rated heat current(A) |
*0 |
*0 |
*2 |
*0 |
*0 |
|
Electrical life |
AC3×**0 |
**0 |
**0 |
**0 |
**0 |
*0 |
AC4×**0 |
*0 |
*0 |
*0 |
*0 |
*0 |
|
Mechanical life ×**0 |
***0 |
***0 |
***0 |
***0 |
**0 |
|
Number of the contacts |
3P+NO |
|||||
3P+NC |
Type |
SC-D*0 |
SC-D*0 |
SC-D*5 |
SC-D*0 |
SC-D*5 |
|
Rated working |
AC3 |
*0 |
*0 |
*5 |
*0 |
*5 |
AC4 |
*8.5 |
*4 |
*8 |
*7 |
*4 |
|
AC3 capacity of phase 3
squirrelcage |
**0/**0V |
*1 |
*5 |
*8.5 |
*2 |
*5 |
**0/**0V |
*8.5 |
*2 |
*0 |
*7 |
*5 |
|
**5V |
*2 |
*5 |
*7 |
*5 |
*5 |
|
**0V |
*2 |
*0 |
*7 |
*5 |
*5 |
|
**0/**0V |
*0 |
*3 |
*7 |
*5 |
*5 |
|
Rated heat current(A) |
*0 |
*0 |
*0 |
**5 |
**5 |
|
Electrical life |
AC3×**0 |
*0 |
*0 |
*0 |
*0 |
*0 |
AC4×**0 |
*5 |
*5 |
*5 |
*0 |
*0 |
|
Mechanical life ×**0 |
**0 |
**0 |
**0 |
**0 |
**0 |
|
Number of the contacts |
3P+NC+NO |
País: | China |
N º de Modelo: | - |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 100 Piece |
Detalle de embalaje: | - |
El tiempo de entrega: | 7-30 days |
Capacidad de suministro: | 500 Piece per Day |
Tipo de pago: | T/T, Western Union |
Grupo de productos : | - |