Precio FOB
Obtener el precio más reciente600 ~ 1000 USD / Metric Ton ( Negotiable )
|25 Metric Ton Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
600 ~ 1000 USD / Metric Ton ( Negotiable )Obtener el precio más reciente
Lugar de origen:
china
Precio de pedido mínimo:
600 per Metric Ton
Cantidad de pedido mínimo:
25 Metric Ton
Detalle de embalaje:
standard sea worthy package
El tiempo de entrega:
5 to 45 days
Capacidad de suministro:
20000 Metric Ton per Month
Tipo de pago:
T/T, L/C
Grupo de productos :
Persona de contacto huqiao
Wuhan, Hubei
Low temperature pressure vessel steel plate and ultra low
temperature steel SA**3E specifications ****0mm, *9MnNiDR
specifications ****0mm,*5MnNiDR specifications ****0mm,*6MnDR
specifications ****0mm.
Pressure vessel steel plate *6MnR, *0R, *5CrMoR, *5MnVR, SA**6Gr*0,
SA**6Gr*0, *0G, SA**5GrC, *6Mng, **0B, *7MnNiMoVDR, SA**7Gr*2CL2,
SA**7Gr*2CL2, SA**7G R*1CL2; AISI***0 SA**5GrCM, SB**0 KP*2, Q**5R,
Q**5R, SPV**5, Q**0R, A**5Gr*0, A**6Gr*0, A**6Gr*0, P**5GH, P**5GH
P**5GH, *9 mn6, *5 mo3, *6 mo3 A**7CL1, sa**2GrC, *8 mnmonr A*8CPR,
A**5Gr*5, A**6Gr*5, SA**2M,
A**7CL2,SB**0
Steel plates for pressure vessels and boiler drum plates
*0g,*6Mng,*5CrMog,*2Cr1MoVg,*9Mng,*2Mng,*3MnNiCrMoNbg,*0R.*6MnR,*5MnVR,*5CrMoR,*3MnNiMoNbR,
*5MnNbR,*5MnVNR,*6MnDR,*9MnNiDR,*5MnNiDR,*2Cr2Mo1R,*4Cr1MoR,*7MnCrMoVR,*7MnNiCrMoVDR,
*5 mnnidr, SB**0, SB**0 SGV**0, SBV1A, SBV1B, SBV2, SBV3, SEV**5,
SEV**5, SEV**5, crmo**0 *0, *5 mo3,
*3 crmo*4, *9 mn6, BHW*5, *3 mnnimo*4, 1 cr*5mo, 2.*5 Cr1Mo, 1.*5
Cr0.5 Mo, A**9M (S), (S) A**5M *0,*5,*0) (Gr),
(S) A**4M (Gr, A, B, C), (S) A**7M (Gr*1, *2, *2) and (S) A**7M
(GL) 1, GL. 2), (S) A**2M (Gr. A, B, C), (S) A**2M (Gr. A, B,
C),
(S) A**7M (Gr. B, C), (S) A**8M (Gr. A, B, C), (S) A**3M (I, II),
P**5GH, P**5GH, P**5GH, P**5GH, *6 mo3, *3 crmo**5, *0 CrMo***0, *1
CrMo***0, A*2 , A*2, *0 MNHR, *0 hr, *6 MNHR, **1 g**0 WDB**0
Commonly used delivery states are as follows:
Quenching: The process of cooling rapidly after heating above the
temperature of the phase transition point. Increase the hardness of
the material, but reduce the toughness.
Normalizing: Cooling normally (in air) after heating above the
phase transition temperature.
Annealing: After heating to the temperature above the phase change
point, slow cooling. Eliminate quenching effect, eliminate stress,
uniform composition.
Tempering: After quenching, reheating to a certain temperature
(below quenching temperature), holding, and then cooling. Uniform
composition, slightly reduce hardness, greatly improve
toughness.
Generally speaking: first to annealing, normalizing; Eliminate the
effect of original heat treatment. Then quench, then temper.
País: | China |
N º de Modelo: | - |
Precio FOB: | 600 ~ 1000 / Metric Ton ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | china |
Precio de pedido mínimo: | 600 per Metric Ton |
Cantidad de pedido mínimo: | 25 Metric Ton |
Detalle de embalaje: | standard sea worthy package |
El tiempo de entrega: | 5 to 45 days |
Capacidad de suministro: | 20000 Metric Ton per Month |
Tipo de pago: | T/T, L/C |
Grupo de productos : | hot rolled steel plates |