Precio FOB
Obtener el precio más reciente( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
zhenli
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
in wooden plate, need GP or HQ containers
El tiempo de entrega:
30 days after order confirmation
Capacidad de suministro:
-
Tipo de pago:
-
Grupo de productos :
-
Persona de contacto Ms. Cary
Baotang 50, Jiangmen, Guangdong
Standard Configuration
Two-Stage Injection Adjustment |
High Speed Clamping |
Low Pressure Clamping Device |
Automatic Mould Thickness Adjustment |
Computer - Controlled Lubrication System. |
Hydraulic Moving Clamping Unit |
Hydraulic Multiple Ejector |
Nozzle Heater , Gooseneck Heater |
Inclined Clamping Unit |
Fuel-Injection Furnace |
Siemens **0 control system with LCD monitor |
Machine Configuration
Siemens **0 control system with LCD monitor (Germany). |
Imported components are used for hydraulic units including YUKen (Janpan), Rexroth (Germany) and Vickers (USA)to ensure the stability of hydraulic system |
Sealing members are bought from Sealtech of Hong Kong or Veco of France. |
Sealing members are bought from Sealtech of Hong Kong or Veco of France |
Posts and columns are purchased from Zhen Jiang HUA DING. |
Electric parts are purchased from France Schneider. |
After-sales Service
When machine arrives at the Buyers factory, the seller will appoint engineer to your factory for
machine commissioning and installation and training workers.
Warranty
We provide one year warranty for machine and three months for easy-broken Parts.
País: | China |
N º de Modelo: | zhenli |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | in wooden plate, need GP or HQ containers |
El tiempo de entrega: | 30 days after order confirmation |
Capacidad de suministro: | - |
Tipo de pago: | - |
Grupo de productos : | - |