Precio FOB
Obtener el precio más reciente900 ~ 1400 / Ton ( Negotiable )
|20 Ton Minimum Order
País:
China
N º de Modelo:
Steel space frame storage1
Precio FOB:
900 ~ 1400 / Ton ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
900 per Ton
Cantidad de pedido mínimo:
20 Ton
Detalle de embalaje:
As per requirements.
El tiempo de entrega:
20 to 25days
Capacidad de suministro:
1000 Ton per Week
Tipo de pago:
T/T, L/C, Western Union
Grupo de productos :
Persona de contacto Heidi
Xuzhou, Jiangsu
Prefab space frame steel structure coal storage shed for power plant
Project name |
Philippine Toledo Power plant Coal Storage Space frame Roof Project |
Type |
Bolted ball joint Space Frame |
Size |
Length:**0m, Width:*8m, Height:*2.*7m, Foundation height:2.*5m |
Projected area |
****0M2 |
Steel weight |
**2T |
Cladding system |
0. 6mmColor Steel Sheet,1.2mmFRP Light Panel |
Wind zone |
2 (**0kph) |
Seismic zone |
4 (Z=0.4) |
Construction outline |
Steel Space Frame ,Enclosure System ,Embedded parts manufacturing(Non-embedded parts laying) |
Anti-rust treatment |
Main components by hot-dip galvanization |
Project duration |
**0Day |
Structure type |
Steel Space Frame Structure |
Cladding material |
Galvanized purlin , Color steel sheet, Fittings , etc |
Features |
1. Stable and Aesthetic |
2. Structure is durable for *0 years |
|
3. Fast and easy to install |
|
4. Extensive Applications: Storage, Warehouse, Exhibition Hall, Terminal Building, Stadium, Theater, Special-shaped Buildings , etc |
|
5. High anti-rust performance |
|
6. Flexible composition: Doors and Day-lighting roof could be installed at any position |
We have manufacurerd and installed three set of large span coal storage of power plant in Philippine.
País: | China |
N º de Modelo: | Steel space frame storage1 |
Precio FOB: | 900 ~ 1400 / Ton ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 900 per Ton |
Cantidad de pedido mínimo: | 20 Ton |
Detalle de embalaje: | As per requirements. |
El tiempo de entrega: | 20 to 25days |
Capacidad de suministro: | 1000 Ton per Week |
Tipo de pago: | T/T, L/C, Western Union |
Grupo de productos : | steel structure |